My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC12058
DRMS
>
Back File Migration
>
Inspection
>
INSPEC12058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:13:56 PM
Creation date
11/18/2007 8:54:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981042
IBM Index Class Name
Inspection
Doc Date
3/29/2000
Doc Name
MINE SITE EVALUATION
Inspection Date
3/2/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />- <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ ARNESS-MCGRIFFIN MINE Permtt C-81-042 Field Visit 03/02/2000 Continuation Page <br />Person Number Date <br />28. Pertormance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified E sewhere, 6=Previously Cited <br />A. Administrative D. Backf"dling & Grading H Subsidence Control Plao <br />I. _ Mining within Valid Permit . <br />l._ Exposed Openings I _ <br />Roads <br />2. _ Mining within Bonded Area . <br />2._ Contemporaneous Reclamation 1 <br />Road Consuuction <br />3. _ Terms & Conditions of Permit 3._ Approximate Original Contour . <br />Certification <br />2 <br />4. _ Liability Insurance 4._ Highwall Elimination . <br />3. <br />Drainage <br />5. _ Ownership and Control 5._ Steep Slopes (includes downslope) _ <br />Surfacing and Maintenance <br />4. <br />6. _ Temporary Cessation 6._ Handling of Acid & Toxic Materials _ <br />Reclamation <br />5 <br />7. _ AML Rec. Fees -- Non-Respondent 7,_ Stabilization (rills and gullies) J. . <br />Signs & Markers <br />8. _ AML Rec. Fees -- Failure to Pay E. Excess Spoil Disposal I. <br />Signs <br />B. Hydrologic Balance I._ Placement _ <br />2. <br />Markers <br />l._ Drainage Control 2._ Drainage Control K. _ <br />Distance Prohibitions <br />2._ Inspections & Certifications 3._ Surface Stabilization <br />L. <br />Revegefation <br />3._ Siltation Swctures 4._ Inspections & Certifications I • <br />Vegetative Cover <br />4._ Discharge Swc[ures F. Coal Mine Waste _ <br />Timing <br />2 <br />5._Diversions (Refuse Piles/Lopoundments) <br />M. - <br />Postmining Land Use <br />6._ EfFluent Limits L_ Drainage Control _ <br />7._ Ground Water Monitoring 2._ Surface Stabilization N. Other <br />8._ Surface Water Monitoring 3._ Placement General <br />9._ Drainage -- Acid-Toxic Materials 4._ Inspections and Certifications Performance <br />l0._ Impoundments 5._ Impounding Swctures Category <br />I I._ Stream Buffer Zones G. Use Of Explosives ~ I) forfeiture evaluntion - <br />C. Topsoil & Subsoil _ <br />l._ Blaster Certification <br />I._ Removal 2._ Distance Prohibitions ~) <br />2. Substitute Materials 3._ Blast Survey/Schedule <br />3._ Storage and Protection 4._ Warnings & Records 3) <br />4. Redistribution 5._ Control of Adverse Effects <br />Performance Standard Categories E. Excess Spoil Disposal ......... ..................................(816/817.71-74) <br />30 CFR Counterpart I. Placement .................................. .........................................................71(e) <br />A. Administra[ive ........................................ <br />. ... 2. Draina a Control .................... <br />............................. g .. <br />......................................................71 <br />... <br />1. valid Permii ........................................................... ..........................773.1 I 3. Surface Stabilize(ion................. ..........................................................71(g) <br />2. Mining within Bonded Area ......................... .......................773.1 I 4. Inspections &Cenifications...... .........................................................71(h) <br />3. Terms & Conditions of Permit ...................... .......................773.17 F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,($16/817.81-84) <br />4. Liability Insurance ......................................... <br />5. Ownership and Con[rot ................................. .......................800.60 <br />......................778.13 1. Drainage Conlrol ..................... <br />..........................................................83(a) <br />6. Tem ovary Cessation ................. 842. <br />. ............ <br />7 <br />AM R <br />F <br />N <br />R <br />d 1 I (e) & 816/817.131 2. Surface Slabilizalion................. <br />3. Placement.................................. <br />870 <br />15 <br />6 .........................................................83(6) <br />.........................................................83(c) <br />. <br />ec. <br />ees -- <br />on- <br />espon <br />ent .............. <br />8. AML Rec. Fees -- Failure to Pa <br />y ................... .................. <br />. <br />( <br />) <br />870.15(a) 4. Inspections and Cenificalions ... <br />.................. <br />........................................................83(d) <br /> <br />5. Impounding Stmctures .............. .. 84 <br />.......................................................... <br />B. Hydrologic Balance ................................. .....(816/817.41-57) <br />G. Use of Explosives ................ <br />..................................(816/817.61-68) <br />I. Drainage Control ........................................... <br />2. Inspections &Cenifications .......................... ..............................45 <br />...................49(a)(10) I. Blaster Cenification.................. <br />.........................................................61(c) <br />3. Siltation Structures ........................................ ..............................46 2. Distance Prohibitions................ .........................................................61(d) <br />4. Discharge Stmctures .................................... ...............................47 3. Blast Survey/Schedule.............. .........................................................62-64 <br />5. Diversions ..................................................... ..............................43 4. Warnings & Records ................ ......................................................66 & 68 <br />6. EfFluent Limits .............................................. ..............................42 5. Control of Adverse Effects....... ..............................................................67 <br />7. Ground Water Monitoring ............................ ..........................41(c) H. Subsidence Control Plan.........................................(817.121-122) <br />8. Surface WaterMonitoring ............................ ..........................41(e) I. Roads.................................. ...............................(816/817.150.151) <br />9. Drainage--Acid -Tozic Materials ................. ..........................41(f) <br />10. Impoundments .............................................. ..............................49 I. Road Construction.................... .......................................................150(c) <br />I I. Stream Buffer Zones ..................................... ..............................57 2. Cenification.............................. ........................................................151(a) <br /> 3. Drainage .................................... ...........................................150(6)-I51(d) <br />C. Topsoil &Subsoil .................................... ...........(816/817.22) 4. Surfacing and Maintenance...... ............................................I50(e)-151(d) <br />I. Removal ........................................................ ..........................22(a) 5. Reclamation.............................. ........................................................150(f) <br />2. Substitute Materials ....................................... ..........................22(c) J. Signs & Markers.......................................................(816/817.11) <br />3. Storage and Protection .................................. <br />4. Redistribution ................................................ ...........................22(c) <br />..........................22(d) I. Signs......................................... <br />............................................I1(a).(b).&(c) <br /> 2. Markers ..................................... .................................I I(a),(b).(d).(e).&(f) <br />D. Back£dling & Grading ..............................(816/817.95-107) K. Distance Prohibitions........ ...............................................(761.11) <br />I. Exposed Openings .....................816/817.13, 14, I5, & 823.1 I & 21 L. Revegeta[ion...................... ...............................(816/817.111-116) <br />2. Contemporaneous Reclamation ..................... .............................100 <br />3. Approximate Original Contour ...................... ....................102(a)(1) I. Vegetative Cover...................... .................................................Ill & 116 <br />4. Highwall Elimination ..................................... ....................102(a)(2) 2. Timing...................................... ............................................................113 <br />5. Steep Slopes (includes downslope) ................ ............................107 M. Postmining Land Use........ ......................................(816/817.133) <br />6. Handling of Acid &Tozic Materials .............. ........................102(c) <br />7. Stabilization (rills and gullies ) ....................... ...........................95(6) Rcvual Dcccmbcr i. IY98 Page 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.