Laserfiche WebLink
<br /> <br />INSPECTION REPORT - PAGE 2 <br />FILE N0. M-83-141 <br />DATE: April 11, 1986 <br />OBSERVATIONS OF IMPORTANCE: <br />1.) We attempted to contact the operator several times prior to the <br />inspection, but we were not successful. <br />2.) No personnel were on site at the time of the inppection (possibly lunch <br />hour). <br />3.) Miii building facilities and the tailing pond area are substantially <br />constructed. It appeared that no liner has been installed at this time. <br />4.) Topsoil/growth medium has been properly stockpiled. <br />5.) Mater was flowing over the top of the installed bulkhead at the <br />underground water storage area. <br />6.) In general, construction appears to be proceeding as planned, <br />RECOMMENDATIONS: <br />1.) Please update us as to your progress regarding the remaining issues <br />outlined in our letter of f4arch 11, 1986. <br />/bdc <br />Doc. No. 9262E <br />