Laserfiche WebLink
f2~g~ <br />MINE ID # OR PROSPECTING ID #: nn-t estt_t 53 <br />INSPECTION DATE: t t/8/Q6 INSPECTORS INITIALS: ~.A!? <br />OBSERVATIONS <br />This inspection was performed as part of the Division of Reclamation, Mining, and Safety's four-year <br />monitoring program. Present at the inspection was Kate Pickford, DMG. Weather at the time of the <br />inspection was clear, calm, and approximately 70 degrees. <br />2. A sign is posted at the entrance to the site. Some of the boundary markers could be located at the site. <br />Disturbance at the site consists of a pit with a near vertical highwall, stockpiled materials stored within <br />the pit, and a berm, consisting of stockpiled topsoil and overburden, surrounding the site. The site is <br />permitted for 20 acres of disturbance. <br />3. Current activity at the site appears to be within the parameters of the approved permit. A bond <br />calculation will be conducted as a part of this inspection and changes in the required bond will be sent <br />in a separate letter. <br />I & E Contact Address <br />NAME: Ralph Martinez <br />OPERATOR: Southway Construction Company. Inc. <br />STREET: 117 White Pina nr. <br />CITY/STATE/ZIP: Alnmrxn Cl~ R1101 <br />Cc: ^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />X Other: <br />