Laserfiche WebLink
111. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was an partial inspection of the Seneca II Mine for the month of December, 1996. The <br />mine has basically stopped the production of coal and has only to haul the exposed coal to the <br />power plant ,then activities to finish the reclamation plan can commence. A heavy snow was <br />falling at the time of the inspection which hampered access and visibility. <br />ROADS: Again, due to continuing snow storms the site is extremely muddy and work on the <br />roads has to be delayed until either the roads dry or freeze. However, all work on regrading and <br />reestablishing the road drainages due to the disturbances caused by the movement of the <br />dragline MUST be completed prior to the January inspection. <br />HYDROLOGIC BALANCE: The maintenance facility area was inspected and although very <br />muddy, all ditches and ponds were functioning. <br />