Laserfiche WebLink
Page 3 <br />Topsoil Handling <br />Procedures <br />Proper stockpile location <br />Stockpile stablization <br />Comments: <br />- What was thought to be a topsoil stockpile on the northern edge of the mine <br />" bencli'has beE~h determined tb be bddbbsdlidat~d"mdteFial''le'Ft bV~~''from <br />cbnstructibn'of the `diversion'ch'ann21 itnd'som@'s1ou'ghAge from thb'~face- <br />up that was piled there. ' <br />The original mine plan map indicated that this was a topsoil stockpile <br />location, but on closer inpsection of the material and after discussing <br />the matter with Mr. Asher, it was determined that the material there <br />now is not topsoil and the original stockpile was moved to the large <br />stockpile below the mine bench. <br />Revegetation <br />Vegetation efforts on schedule <br />Site preparation proper <br />Fertilization needed <br />Suitable species <br />Estimate covnr <br />Poisnous or noxious species <br />Livestock usn <br />Wildlife use <br />Reseeding necessary <br />Comments: <br />No revegetation efforts are being conducted at this time. <br /> <br />Problems <br />Recommendations s Ccmoliance Dates <br />1) Perimeter markers - Install as described above by February 28, 1981. <br />2) Topsoil markers - Install by March 15, 1981. <br />3) Diversion Above Bench - Situation will be evaluated by staff engineer- <br />For description of problem see attached sheet. <br />4) Sediment pond at botton - Complete by March 15, 1981. <br />of road leading to mine bench <br />5) Drainage on northern end of mine bench - construct as described above (back- <br />felling and grading section) by February 28, 1981. <br />6) Road ditch draining coal stockpile - complete as described above (Prot. of <br />hydrologic system section) by February 28, 1981. <br />General Site Descriptions - Comments: <br /> <br />