(Page 4) <br />MINE ID # OR PROSPECTING ID # M-1978-091 UG <br />INSPECTION DATE 10/18/05 <br />INSPECTOR'S INITIALS RCO. HHP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMSIPOSSIBLEVlOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The ore pile at the site was not tarped, though the approved plan requires that it be 12131/05 <br />tarped during precipitation or when the site is unmanned. PB or PV: PB <br />TOPIC(S): MP <br />CORRECTIVE ACTION: The operator must tarp the ore, and provide a statement that _, _, <br />ore will remain tarped as required by the plan. The statement must be received from <br />the operator by the date shown at right. <br />2. Hydrocarbons and lead batteries are stored at the site without the required impermeable 12/31/05 <br />secondary containment. PB or PV: PB <br />TOPIC(S): AT <br />CORRECTIVE ACTION: The operator must either cease storing these items at the site, _, _, <br />or provide adequate secondary containment for all such items. A statement describing <br />how these items will be handled (as discussed in this report) must be received from the <br />operator by the date shown at right. <br />The slope above the borrow area is unstable and its failure will result in offsite damage. <br />CORRECTIVE ACTION: The operator must eliminate the potential for slope failure <br />and/or offsite damage, by either backfilling the borrow area or amending the permit to <br />add land to the north of the present boundary, or other reasonable alternative (proposed <br />by the operator). A statement describing the alternative to be chosen by the operator <br />must be received by this office by the date shown at right. <br />4. None. <br />CORRECTIVE ACTION: NA <br />5. None. <br />CORRECTIVE ACTION: NA <br />12/31 /05 <br />PB or PV: PB <br />TOPIC(S): BG <br />PB or PV: <br />TOPIC(S): <br />PB or PV: <br />TOPIC(S): <br />CERTIFICATE OF SERVICE <br />I, Bob Oswald, certify that I deposited a true and complete copy of the foregoing document (inspection report) to the person <br />designated herein to receive a copy, at his address of record. This was placed on the signature date shown belowwith the US <br />postal se ice//, po ge paid. p <br />signatur '~ date <br />