My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC11661
DRMS
>
Back File Migration
>
Inspection
>
INSPEC11661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:13:39 PM
Creation date
11/18/2007 8:52:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995057
IBM Index Class Name
Inspection
Doc Date
10/18/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No. Task Description ~ Cos[ (E) <br />__________________________________________________________I____________ <br />NA ~ Not indicated ~ <br />Subt otaL (K): <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Description ~ <br />__ <br />_____ Cast (E) <br />_I <br />_____ <br />_____________________________________________I_ <br />NA ~ Not indicated ___________ <br />_____________________________________________________________ <br />Subtotal (L): ___________ <br />_ <br />H. MISCELLANEOUS RECLAMAT~I ON TASKS ___________ <br />Task No.l Task Description ~ <br />________I__________________________________________________I_ Lost (E) <br />___________ <br />4 ~ Demolition assume mass 10'L " 5'N ' 5'11 a E.22/cf~ E55 <br />2 ~ Seeding per attached task 2 worksheet ~ E329 <br />NA ~ Fencing not required at this time <br />3 ~ Nob/Demob per attached task 3 worksheet ~ <br />_____________________________________________________________ E753 <br />___________ <br />Subtotal (N ): E1, 137 <br />_ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): ___________ <br />E1,401 <br />_ <br />II. INDIRECT COSTS <br />_____________________________________________________________ ___________ <br /> <br />___________ <br />____________________________________________ <br />A. CONTRACTOR'S OVERHEAD & PROFIT <br />Item No.~ Item Description ~ <br />________ <br />___ <br />_ Cost (E) <br />I <br />_ <br />_____________________________________________I_ <br />1. ~ Public Liability Insurance.... 1.SSOX of dir. ~ ___________ <br />E22 <br />2. ~ Contractor's Performance Bond 1.SSOX of dir. ~ E22 <br />3. ~ Contractor's Profit........... 10.OOX of dir. ~ E140 <br />4. I Job Superintendent..equip op serves as super <br />Subtotal (A): E183 <br />_ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): ___________ <br />E1,584 <br />_ <br />B. DMG PROJECT ADMINISTRATION E%PENSES ___________ <br />Item No.~ Item Description Cost (E) <br />1. Minerals Program Admin. Fee at 5.007. of cntr.~ <br />__________________ <br />_ E79 <br />________ <br />__________________________________ <br />NET INDIRECT LOST PERCENTAGE: 18.76X Subtotal (B ): ___________ <br />E79 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E263 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E1,663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.