My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC11613
DRMS
>
Back File Migration
>
Inspection
>
INSPEC11613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:13:37 PM
Creation date
11/18/2007 8:52:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
3/29/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />A complete quarterly inspection was conducted by DanMathews of DMG. Walter Whitledge and Chuck <br />Silengo of LEI were present during portions of the inspection. Weather was cleat and mild and the site was <br />free of snow. The mine was not operating at the time of inspection, and only a skeleton crew of mine <br />personnel was on site performing underground maintenance. <br />Availabiliri of Records <br />Office records were checked and for the most part required records were on file and up-to-date through the <br />4's qff, 2001. At the time of the inspection, annual certifications for the excavated SAE sediment traps and <br />a requested revised annual certification for the sedimentation pond had not been filed at the mine office. <br />The certifications were received by DMG on Mazch 29, 2002, and need to be placed on file at the mine <br />office. <br />Roads <br />Road surfaces and drainage structures were in general properly maintained and functional. Middle and <br />lower filter fabric ditch outlet sediment traps require clean-out, and the filter fabric should be replaced. <br />Hvdrolonic Balance <br />At the upper north side drop inlet culvert, some brush has grown up over the drop inlet opening and should <br />be cut back. Drainage control ditches and culverts were in general well maintained and functional. <br />Sediment pond reconstruction appeared to have been completed in compliance with We approved design, <br />and was certified by P.E. The pond was dry at the time of the inspection. <br />Two soi]/Reveeetation <br />Areas disturbed by recent flood damage repair work, including the topsoil and construction dirt stockpiles <br />and sediment drying azea, had been broadcast seeded with the interimseedmix and mulched. <br />
The URL can be used to link to this page
Your browser does not support the video tag.