Laserfiche WebLink
BYo~saarsh~~isp.afim tb oo~~feo`d~dLdaada6.a~fos~iAais~io~p~im Glo~rmiodreel~~q <br />~6~~~t ~wl~. W~ a.rsar ie~pMNm d ~ iebswJdeo~ ^~pputlga dr~~~ Pekin <br />probctios from disturbed area of the ceclamatia plm anal there area became revageubd. The privab <br />brigatim dibh and lbme wu flowing. The print arlaian weti was not ohedcad. <br />BACKPII.L AND GRADING Bacls~ aff>be appor porgls appear stabb. Gcadmg w+rlt be shoed u the sal <br />mine wasba ace removed 5rom the upper areas and buried m the borer pabl area. The aver scar 6amro of <br />the lawar air paW rv>yl be fiDed in wig >be coal mice web materials and oovored widr spor7. This era is ifl be <br />oompbbd with s flsal grade that ~ shed snrfico water offmb the va0ay Boor. Elimeatia of the upper sib <br />bmtdt ie saggubd b AML, but impbmonlatioa mry rat be wifbio 1be badgat <br />PROCESSING WASTE The coal mice wash pBes b the site aro diamaed u prooasog wash n ~s <br />pmgtaph, but may actually be devebpmont wash. Cal mroe wash prlea ne bated at the upper pocW era <br />and a dump nmout b ~e ast, at the west and afthe borer beneJt era, and above the lower porW. Removal <br />and bmisl of these pits is plsmed (with the esceptim of the assbm ronout pc7e and the weabro pik tabor the <br />rod) m the AML rellamation project. Inelnaia of>bde iwo piles in the reclamation project has bean <br />recommended b AML. <br />GENERAL MINE PLAN COMPLIANCE Thera is no gmad mine plm o16er thm ~e rochmstioe plm bomg <br />mdertalom by AML (>be permit has been farfeiled at this site). <br />PLSH AND WII.DLB+E Fuh roaoaroa b Faarmrb Croak aro probcbd by a sedimmtalim pmd and the flat <br />depaitional area provided by ~e bwor waking arcs of the silo. No wi7dfifie wu observed at the Bile dur>og this <br />ospeotioo. <br />REVEGETATION No rooad wu found ofvegetatioo reol®atiao elfarL The olaarwafar diverdoo ditch bas <br />some grass armor in the botbm. The oppa paW b®ah aces hu mmy weeds (of those, Hoandstmgae is <br />oootidaed naosious). The Iowa road and bm~ eras is wall vegeubd with gmwet, and mach of the slope area <br />have brush cover. Seedag of ro-dismrbad area is a part of the plmnad AML reclamation project <br />SLIDES AND DAMAGE No slide was noted on orb. The borer ore pain has caved is behind the sal for a <br />disunoe of approrimably 75 feet. Caroclioa of this featnro is plmned b the AML cedamation project. Thera <br />has been oofLpse at the aishaR (not inspected during this inspection) foaled b the north of the upper poufs <br />(NW Y. NW Y. Sea 33, T7N, R89W~ This feature u sppras~ately 30 feat loop. l S fast wide, and 10 fast deep <br />deectlyy (sppacmdy) over dre vortical shag Correction of thin feature hu tam recommended b AML. The <br />nppa olar-water interoeptor diroh hu brached and 511edm as descnbad above. The mine wash erb wall is in <br />didepaf, and erosion 6esacres have devebped on the cal mine wash p0n. The aver sod act wall am ilema <br />addressed m ~e reolamstieo psajeot. Repai of ibe nplasd diversion dite6 and aoriao of cal wash pile have <br />hem brought to the attention of AML. <br />No absideaoe fesmre boa Gem noted at 16e sAO. <br />RECLAMATION SUCCESS The baok511 and obanre of ~e upper path hu hem wacepfirL Seating of the <br />borer air porbl fus Bart hem saooessfal (oave•a ba6od~ bat oaroetioo of 16is do~icfesoy is meJoded io >be <br />planned AML work. <br />Q~$ The damp doe oondrts of army pieoa (pub) of agaipmeat (son). Boris) of These dump items and <br />misoeDsoaow truh afwat the sib hu hem rooemmeoded to AML u part of ibo cedsmatico projeoL Thera aro <br />two bands of atilmown malarial on the steer sae pactisfly buried at the apps boac6 and one an the borer beach. <br />IMposal af>bese two items hu tom recommended to AML. A nombx of pidoros ware tskeo far a roocrd of <br />Papa S of _7 Papua, (date) 27 July 1tiDO , (initials) SaN <br />