Laserfiche WebLink
iii iiiiuiiniu iii <br />999 <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Pro <br />I. PermitteelPerson <br />BASIIV RESOURCES, IIVC. <br />2. Address <br />3800 COUNTY ROAD 63.9 <br />3. City 4. State <br />Trinidad CO <br />5. Zip Code 6. Phone Number <br />81082 (719)846-2427 <br />7. Operator Name, if Different than Petmittee <br /> <br />8. Mine Name <br />GOLDEN EAGLE <br />RECEIVE, <br />9. Permit Number 10. Permit Type <br /> C-013-81 ~~0 PP <br />11. Field Visit Date <br /> <br />10/20!2000 !2 ~~P p 13. SRA Present <br />~yferals 8 Geol~ <br />OFS J N <br />mm-dd -yyyy <br />14. Permit Status I5. Si[e Status 16. Facility Type <br />A~ Pl <br />17. OSM Office # 18. CC[D H 19. fend Code <br />140 C~ SF <br />20. M.S.H.A m # 2l. State Frbrev. 22. County Name <br />OS-02820 CO LAS <br />23. AVS Permittee En tity ID Number 24. State Office <br /> 103972 <br />25. Hours 26. S' azure Block 27. Reeviewing Official' ~j~-~ <br />0.0 a. Permit Review \ 1 ~.,. ,~ F;-W~t~y"' <br />0.0 b. Site Visit Time Sig a ure: l~ 60 ;Signature: <br />HENRY A STIN ID # 116 <br />0.0 c. Travel Time Review Date: ~O /.ZS/ ZOO(j <br />Printed Name: mm - dd - yyyy <br />1.0 d. Report Writing Date: 10/20/2000 Is Supplemental MSE Pagc Used YR[I~ <br />Permit Type -Item 10 IP = Intedm Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 ~ CCR... Citizen Complaint Refertal (non site visit) <br />Oxx... Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspeetlon -Item 13 A joint Inspedion is when a state inspector aaompanies en OSM inspector any time dudng the review of the mine site. <br />Permlt Status -Item 14 AB....Abandoned: All surtace and underground coal miningg activites have ceased and <br />operator has left the site without completing redamation es defined in <br />A.... Active: Coal mining and redamaton activities occurting or 30 CFR 340.11(8 <br />ppermitted but not yet drsfurbed. AB7..Bond Fofeiture: ~ foderture otFdally In proa3ss or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation In progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Progrartt Permit) AB2..Partially Reclaimed Forfeiture: Forfeited sfle whrue all bonds have been <br />Coal mining completed and recamation acOvities initialed. used to redalm site, but site not redaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3.. Reclaimed Fodeiture: Forfeited site that haz been redaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site Is unpermitted. <br />Site Stelus Codas -Item 16 <br />ND..No Disturbance: No wal mining and reclamation MC..Mining <br />operations have been stared. site rag <br />~~~ hav <br />d whe <br />oa <br />mti <br />n <br />o <br />e a on <br />t TC.. c <br />arted an <br />l <br />ni <br />g <br />p <br />e <br />e s <br />re c essati~ <br />have not begun. 817.13 <br />AP.. Active Coal Producing: Coal suAace mining P1...Phase <br />adivites are occurring. granter <br />AN.. Active Non-Producing. Active non-producing permits <br />facility such as tipple or preparation plant. <br />i <br />M <br />i <br />Th <br />P <br />it <br />i <br />N <br />i <br />St <br />t <br />ti <br />N P2.. Phase <br />f <br />h <br />in <br />ng: <br />us <br />s ac <br />o <br />e <br />erm <br />t <br />a <br />ve, s <br />e <br />s <br />M.. or t <br />e <br />not in Temporary Cessation, no surtace coal P3.. Phase <br />mining activity, and site not regraded. the RA <br /> NS. . Non-Site Visit: Status o1 site not deter <br />No mining activity on site, <br />i <br />i FP.. Fofeiture Pending The RA is pursuln <br />ti <br />ll <br />d th <br />k <br />th <br />it <br />awa <br />t <br />ng phase bond release. e <br />ac <br />e perm <br />, Do <br />ons to revo <br />e <br />ion: The RA has granted <br />t t <br />30 CFR 81 <br />/ pertormatlce bond(s), and/or redama~ <br />g pursuan <br />o <br />6 lion of torleited site is in progress. <br /> FR. . Forteited end Reclaimed: Fodeiture <br />At least Phase I bond release reclamation wmpleted. <br />permitted area. For interim FO. . Abandon~ad Site: Abandoned site that <br />nil release. ~ is ertnittad but there is no bond. <br />acmry r ype epees - eem [o D...Ancillary (Haulroad. Conveyor, and/or Rails) <br />A... Surtace E... Refuse and/or Impoundment <br />8... Underground F... Loadingg Facility and/or Tipple <br />C... Preparation Plant G... Stockoles <br />1t Phase II bond release WC. ildcat: (:Dal mining and reclamation <br />ea. operations have or are taking place and <br />.oration completed and the activity is not covered byy the <br />ond. required permits from the RA. <br />H...Exploration Permits L... Remining site ppeertnimed <br />I... Notice of Intent to Explore under 30 CFR766.26 <br />J... Exempt 16 and 2l3 <br />K...Govemment Financed Constmction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREF,A) <br />Your Comments Are Important <br />The Small Business and Agnculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were estatdished to receive comments Irom <br />small businesses about Federal agency en(orcemenl actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. 1(you are a small business (a business with 500 or fewer employees including those of affiliates) Pagc I of <br />and wish to comment on the en(orecmem or compliance activities of OSM, call I -R8R-REG-FAIR (1-888-7}4-}247). x,~.,+~u n,~~mk, +. ~wx <br />