My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC11574
DRMS
>
Back File Migration
>
Inspection
>
INSPEC11574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:13:35 PM
Creation date
11/18/2007 8:51:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Inspection
Doc Date
1/2/1995
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
12/4/1995
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L - <br />~~ <br />(Page 2) ' <br />NINE ID f OR PROSPECTING ID f M-82-015 <br />INSPECTION DATE 12/4/95 INSPECTOR'S INITIALS ACS <br />OBSERVATIONS <br />The inspection report filed after the 7/31/95 inspection of this site included a requirement <br />to poet an entrance sign in accordance with Rule 3.1.12. The required entrance sign had been <br />posted at the time of this inspection. <br />Since the time of the 7/31/95 inspection, the operator had graded and levelled a number of <br />areas on the floor of the larger pit east of the WYCO Pipeline. Some grading work had also <br />been completed along both the north and south pit perimeters. <br />A short section of over-steepened elope was inspected at the south pit perimeter near the <br />east end of the pit. Because a fairly dense stand of shrubs and small trees had developed <br />on this elope, the operator wanted to know if it could be left ae it le for reclamation. The <br />Division's determination ie that this elope will have to be graded to a maximum elope of 3:1 <br />in accordance with the approved reclamation plan. <br />The operator had surveyed and staked the elevations of the anticipated water level once the <br />pit ie allowed to flood. It appears that an extensive shallows, approximately 30 feet in <br />width, will develop along the eastern end of the north pit perimeter. This shallow area <br />should promote the development of emergent wetlands vegetation. At the break in elope along <br />the north pit perimeter, the pit elopes steeply down to a de-watering trench. Given the <br />extensive ehallowe that will develop at this part of the pit, the Division will relax the 3:1 <br />grading requirement for this elope. The drop-off from the ehallowe along the north pit <br />perimeter must be graded to be no steeper than 2:1. <br />The operator wanted to know if trees that are currently below the elevation of the <br />anticipated water level would have to be removed prior to flooding the pit. Since the number <br />of trees affected ie small, and because the partially submerged trees may provide wildlife <br />habitat, the operator would not be required to remove the trees. <br />Based on observations made during this inspection, and on information provided in a letter <br />from Siegriet Construction Co. dated 11/6/95, the following reductions can be made in the <br />Division's previous reclamation cost estimate: <br />The coat for final grading and establishment of 3:1 elopes can be reduced to 511,572.00. <br />The coat for ripping compacted areas can be reduced to $1,643.00. <br />The coat to replace topsoil can be reduced to 60,000.00. <br />The cost for dewatering can be reduced tc $5000.00 (this reduction ie justified because <br />moat of the grading needed below the projected waterline ie completed or underway). <br />The cost for revegetation can be reduced to 52,818.00 (this ie a 50 percent reduction in <br />the coat of planting trees and shrubs from the Division's previous estimate). <br />The reductions in the previously estimated reclamation caste yield a new estimated coat of <br />$158,000.00. <br />A BOND IN TB8 AMOUNT OF ¢158,000.00 NUST 88 IN PLACB FOR TRIB PIT NO LATER THAN JANUARY 29, <br />1996. <br />The operator may either submit a new bond in the full amount of $158,000.00, in which case <br />the existing bond would be returned, or the operator may submit a rider to the existing bond <br />to bring the amount held to $158,000.00. <br />~ 6 8 Contact Address cc: Carl Nount, DNG <br />^ C8 <br />NAME Bob Siecrist ^ BL <br />OPERATOR Siecriet Construction Comoany ^ FS <br />STREET 6999 York Street ^ HW <br />CITY/STATE/ZIP Denver. CO 80229-7399 ^ HMWHD (CH) <br />^ SE <br />^ WQCD (CH) <br />^ OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.