Laserfiche WebLink
(Page 2) • <br />MINE;~ID # OR. PROSPECTING ID # M-94-117 <br />INS F'ECTION DATE 11/17/98 INSPECTOR'S INITIALS CLK <br />O85ERVAT IONS <br />The following observations were made during the placement of the new liner along the upstream <br />face of the dam and in the old pond area. <br />1) The trench along the crest of the dam had been dug according to specifications (2'x2') and <br />the liner was inserted correctly. <br />2) A. fusion weld was planned for sealing the two sets of 60 ml HDPE liner together over the <br />interim dam trench. New detailed pictures of the cross section were requested by DMG from <br />McCulley, Frick & Gilman. <br />3) Most of the wrinkles and folds were pulled and smoothed out of the HDPE by the end of the <br />day. <br />4) The Geotextile Bentofix liner was laid properly over the interim dam, with an overlap of <br />approximately 2'. <br />5) The HDPE liner was anchored with sandbags during and after the installation of the liner. <br />6) The 8" overlap between panels of Bentofix was preserved throughout the process. <br />7) One half to two thirds of the liner installation was completed by the end of the day. <br />I & E Contact Address cc: Carl B. Mount, DMG <br />^ CE <br />NAME Maxine Stewart ^ BL <br />~ OPERATOR ITEC Environmental ^ FS <br />STREET 9605 W. 49`" Ave. #102 ^ HW <br />CITY/STATE/2IP Wheat Rid4e, Co 80033 ^ HMWhID (CH) <br />^ SE <br />^ WQCD (CH) <br />^ Ted Gengler, ZTEC (see above) <br />Will Hamlin, ITEC (see above) <br />Tom Marano, ITEC (see above) <br />Jon Friedman <br />McCulley, Frick, and Gilman <br />4900 Pearl E. Circle, Suite 300W <br />Boulder, CO 80301 <br />Mark Steen <br />P.O. Box 1523 <br />Longmont, CO 80502 <br />