Laserfiche WebLink
I. General Comments (Continued) <br />Topsoil (4.06) <br />The reclaimed portion of the east dump is being topsoiled. Approximately <br />38.5 acres will be topsoiled and reclaimed this year. <br />The operator uses a matrix of stakes to provide control on topsoil replacement <br />depths. Each stake has 14 inches showing above the regraded spoil. Equipment <br />operators replace the soil to cover the stakes. This is an excellent system <br />which could be adopted by other operations. <br />