Laserfiche WebLink
<br />SCRAPER-ONLY WORK <br />CIRCES Cost Estimating Sotlware <br />PROJECT IDENTIFICATION <br />Agenry or organlx alion name : OMG <br />Task tl 004 Stale : Colola~{ permiUjob ii : M-198J-159 <br />Dale . 01/302001 - County : MontlOd' eL Abhrevtalion :none <br />User: WHE Site: Gleason Pi( Filename:M159-004 <br />Permit or other job action : Rouhne 1 fOC bontl2v/ew <br />Task description :Replace topsoil J" - 6" depth over 8 acres af/ecled area <br />HOURLY EQUIPMENT COST <br />Model :Cat 633E Senes 2 <br />Shill basis : 1 per tlay <br />Horsepower 490 <br />Weight (UST)' 56.34 <br />Cost data source . (CRGJ <br />Cost Breakdown : Job utilization o <br />Ownership cosVhour: $79.57 NA <br />Operating cost/hour $176.75 100 <br />Operator cosVhour. $2B.1H NA <br />Total unit cost/hour : $224.50 Total Oeel cosVhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 4,840 LCY lector: NA volume: 4,840 LCV <br />Source of quanl,ry lake-off : (BacJ(43560s!/acJ(0.775'DJ27 = 4,840 cy <br />Source of estimated swell lector : NA <br />HOURLY PRODUCTION <br />Hauline Capacity <br />Scraper Payload (wetghl) Basis Scraper Bawl (volume) Basis <br />Material weight 2,550 pounds/LCY Struck volume: 23.20 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Earth - Dry packetl Average volume : 28 60 LCY <br />Rated payload 82,000 pounds <br />Payload capacity 32.76 LCY Adlusted capacity : 28.60 LCV "' <br />Cvcle Time (load • haul ~ sorea~l • return) : Loading time : 0 90 minutes' <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : ' loatling time per pair on push-pull models <br />Route I Distance (feeq Grade (Ye) Roll. res.(W) Total res.(%) Velocity (fpm) I Travel time (min.) <br />Haul: 450 -4.4 8.0 3.6 1,460 0.49 minutes" <br />Return: 450 4.4 8.0 12.4 892 0.65 minutes" <br />" tiavel Ume atlrysted for acceleration and deceleration at load and dump points <br /> Total cycle lime 2.74 minutes <br />Joh Condition Correction Factor: :: <br /> <br />Site altitude fleet) 6,560 Adjusted Hourlv Production' <br />Altitude adjustment factor 0.96 (Cat HBJ <br />Job elgciency lector 0.83 (1 shiR/tlayJ Unadjusted unit production 627.39 LCYIHour"' <br /> Adjusted unit production : 499.91 LCY/Hour <br />Net lob correction factor 0.80 Adjusted Beet production : 499.91 LCY/Hour <br /> "2umes volume on push pull models <br />JOB TIME AND COST <br />Fleet size 1 Scraper(s) Total job lime : 9.68 Hours <br />Unit cost $0.499 /LCY Total lob cost $2,174 <br />