Laserfiche WebLink
Southfield C-81-014 13 Apr 04 ~C.SY <br />Page 3/3 <br />Offsite Support Facilities (cont.): possible for EFCI to submit a Technical Revision to <br />change their post-mining land use for this area to commercial/industrial. After such a <br />change EFCI would be able to request a Phase III bond release for this area as well <br />as the railroad right-of-way. This release would probably be on the order of 3-4 acres. <br />