Laserfiche WebLink
- ~ ~ ~. <br />INSPECTION REPORT - PAGE 2 <br />FILE N0. 77-302 <br />DATE: May 8, 198b <br />OBSERVATIONS OF IMPORTANCE: <br />1. The mining and reclamation plans have be significantly altered from what <br />was originally permitted. <br />2. The operator is utilizing the access road and plant site currently located <br />on the Holly Sugar Permit - 77-304 (map). <br />3. The current reclamation costs in all probability do not reflect current <br />conditions. <br />RECOMMENDATIONS: <br />1. The operator will need to amend the entire permit application by no later <br />than July 8, 1985. The amendment should include 4 complete copies of the <br />application with attached exhibits. All exhibits must comply with rule 2 of <br />the Regulations. Current reclamation cost calculations will also be included. <br />~yt <br />Doc. No. 0306 <br />