Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was an aerial inspection of the Ohio Creek Coal Mine tt2 for the month of November. 2002. Weather <br />at the time of the inspection was overcast and cold. <br />Hydrologic Balance: The pond is snow covered but appears stable. <br />General Mine Compliance: The mine is set for winter. <br />