Laserfiche WebLink
Bib. a~~or~Yaf~i+Rio..'[YaarrYYibdaYrwlio~r/r~.lgti~~~ Cb~~Yiod~e~~~ <br />~~~ ~~ YY~ idy err Lpntl~ ~ arYQwiib~~~.1iB~~~~ ~~ <br />Thee ate m of inlereu $om prvvro~s mspectrom that <br />bar an ibli partial Phase I sad partial PhaaO A sib inspection. <br />This iaspectioo is in response b a partial Phase II Aapd Release Appia'atim mbimiaed by NCIG <br />Fioaecid IBC. (IeMat, J. E. Sbvar ~ Assoeiales) as Z7, 2001. Thin Caiaado Division of Mimrals <br />and CiedoQY (Divisim) inspedion was s~ed~ubd fbr 20, 2001 io oamplianoe with R.nle 3.03.2(2). <br />The appliatim was expanded 6or partial Phase I Hood m well (April 2.2001). The putpcae of <br />the intpecfim is b evahrne the: <br />lpecLmation opaatiom alkgsd to haver hem oomplebd [Rule 3.03.2(2)]. <br />Remaining Phase 1 teclamation work alter the Phase I Hood Reuse Appliatioa of Jaorrary 23,1995 <br />(decadon of Ocsobar 19,1495) aanaislad of 1) removal dtwo groindwater amitoring wells, 2) removal <br />of a advert (C-3) [Divisim tiger of May 26,1995, Re: Phase I Hand Release Decision Coal Ridge No. <br />1 M'me (C-84065)l, 3) disposal of a pile of waMe md~, 4) bad~lliog of a wtsbpe, S~istn'bMim of a <br />topsor~ siodcpr7e, 6) ropav of a shmP over am of the postds. a~'f7 sdtbiliation of terrace oursbpaa <br />which mhibibd a slump u the time of the bond rebase iospsaim <br />The two mooiloratg wells was Ow 1 and ow-I s .c the Icy I,o.aout Re~lammon of the.ibe was <br />food adequaoe fior release of this area, and the l.aCy i,aadort was removed 6om the permit by Technical <br />ReNi>oao 14 (Deoembar 18,1996). Thns the appliaot ha hero gaoled Phsse); II and III bond release <br />fne this wo& ([see page4-26 ofthe Pbrroit AppBartion Package(PAP)]. <br />(~rlvat 3 was reported as having been removed in 1993 (PAP Plsge 4.3'n. A Division inspection of <br />Ocbber 15,1499 thuod that Cnlvat 3 had hem rmtaved Calvats 2 and 6 ere permanent adverb. <br />Cuhiert S is inlepal to the sed'maalatian pond. <br />TM pile of wash rocks is m item disamed in the PAP mpage4-59 (Og-Mr95). A amber of IuBe <br />rodrs was planed along the aastem toe of the borer terrace. They was to be buried. <br />The baddltmg of a arslope was reported as aooampiished. <br />Material n the two mmainimg topsoil storage ps7a is to be used in recl>mahCn of the sedimeotstian <br />paerd They have been vegetated for probctioo, and have hem properly marloed. The reclamation d Wese <br />two pr7es is camidaed i~al to the reclamation of the sed®eobtian pond. These topsoil piles a~ the <br />footprint of the pits aro not b be rebased m this Phase I sppliation, bat will be ocoaidaed for release <br />a8er they have hem tecWmed under the provisicm of Rub 3.03.1(5). <br />The sbbiliaticn of Earaoe ooblopea whidr eshibiled a ahorp at the tine of the hood was reported as <br />aooompinhed <br />Phase II reclamation warm included fhe esbbliahmeot of ve®ebtien vvbieh supports the approved <br />postmining Lurd use and which meets the spproved sueaess standud for oovar[Rubs 3.03.1(2xb), <br />4.13.11(2) a~ (3)]. Ttre pCatminiag land use is ag<iarhufal (gracing and aoplaod) (Permit Page 463)• <br />no. ~ oT G Patf.a, tr.e.l 2 0 4'~ v / tinittal.) <br />