Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Coal Ridge Mine conducted by Erica Crosby of DMG. No <br />company representative was present during the inspection. The Coal Ridge Mine is in <br />reclamation only status. The inspection involved viewing four aerial photographs taken by Harry <br />Ranney of DMG on January 27, 1998. Several feet of snow cover was noted on site. <br />Roads The road leading into the Coal Ridge Mine was under snow cover, and did not appear <br />passable. <br />Hvdrolooic Balance The mine ditches and sediment pond were under snow cover, but <br />appeared functional. <br />Backfilling & Grading The backfilled and graded area showed no signs of instability or erosion. <br />The bench terraces appear stable as well as the portal areas. <br />