Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />1. Permittee/Person 9. Permit Number 10. Permit Type <br /> GEC STRIP,C/O THE CORLEY CO. (LANDOWNER) C-81-037 PP <br /> 2. Address I I. Field Visit Date 12. Purpose 13. SRA Present <br /> P.O. BOX 1821 02/07/2000 O~ ^Y <br />3. City 4. State mm - dd -yyyy <br /> <br />CO 14. Permit Status 15. Site Status 16. Facility Type <br />Colorado S r. AB FR <br />5. Zip Code 6. Phone Number <br /> <br />80901 ~ ) 17. OSM Office # 18. CCID # 19. Land Code <br /> <br />7. Operator Name, if Different than Permittee 140 <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> REVOKED - DMG ADMINISTERED FREMONT <br /> CO <br />8. Mine Name <br /> 23. AVS Petmittee Entity ID Number 24. State Office <br />GEC STRIP <br />25. Hours 26. S'! a e 1 k 27. Reviewing Official: <br />0.5 a. Permit Review <br /> <br />0 b. Site Visit Time <br />3 5i a e: Signature: <br />. MITCH RO INGS ID # 370 <br />Travel Time <br />q <br />p c Review Date: / / <br />- <br />. Printed Name: <br />mm - dd - yyyy <br />1.5 d. Report Writing Date: 03/08/2000 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....CiUzen Complaint Referral (non site visit) <br />Cxx.,,,Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(9) <br />Permitted but not yet disturbed. AB1., good Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN <br />di <br />P <br />P <br />P <br />.... na <br />ve ( <br />ermanent <br />rogram <br />ermit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation tompleted and State Regulatory A63.. Reclaimed Forfeiture: Forfeited site that has keen reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpertnitted. <br />Site Status Codes - kern 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.. IVo Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phose bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or mclama- <br />have started and where coal minin <br />o <br />atio <br />tion of minin <br />ursuant to 30 CFR 816/ lion of forfeited site i <br />ro <br />ress <br />e <br />i <br />g <br />p <br />g p <br />g <br />. <br />r <br />ns cessa <br />s <br />n p <br />have not begun. 817.131 b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I elease: At least Phase I bond release reclamation completed. <br />activities are occuring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facilit such as tipple or preporation plant. P2.. Phase II Release: Af least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />MY <br />i <br />Th <br />P <br />ti <br />itt <br />d <br />ki <br />l <br />d <br />ti <br />h <br />n <br />ng: <br />e <br />ermit Status is active, site is for the en <br />re perm <br />e <br />area. opera <br />ons <br />ave or are ca <br />ng p <br />ace an <br />NM..No <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the F2A. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, andlor Rails) H... Exploration Permits L... Remining site permitted <br />A... Surtace E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />6... Underground F... Loading Facility and/or Tipple J... Exempt 16 and Z3 <br />C... Preparation Plant G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Smal] Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments &o <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-7343247). xedseeoecember a, rags <br />