Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) _ <br />Retum time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />0.40 0.40 Total non-roadable mob/demob cost <br />0.40 0.40 ' nvo round trips with haul rig <br />0.50 NA Total roadable mob/demob cost ** <br />0.50 NA "one round trip, no haul rig <br />1.80 0.80 <br />Meeker <br />12.0 miles <br />30.0 mph <br />$1,973.56 <br />$0.00 <br />JOB TIME AND COST Total job time : 3.60 hours <br />Total job cost : $1, 974 <br />EQUIPMENT HAUL DISTANCE and TIME <br />