Laserfiche WebLink
<br /> COLORADO DI VISION OF M INERALS AND GEOLOGY <br />D02ER / RIPPER LOST 8 PERFORMANCE DATA WORKSXE ET sheet 1 of 2 <br />Make 8 Model Let D7X (7990) <br />Dozer Blade Universal REF ERENCES: 1) Cost Reference Guide (CRp) <br />Attachment /1 ROPS Ceb 2) Contractors Equipment Coj <br />Tt Guide (CECG) <br />Rear Ripper 3-shank ripper 3) Colorado Contractor s Ass cietion <br />P (CCA) <br /> Wage Rate Schedule <br />Revision Date Mey, 1992 (CRG date) 4) Caterpillar Performance }andbook <br /> (Labor Rete da ta) <br />BASE EW IPNENT COSTS (CRG) <br /> I---------- Bas <br />wx <br />ship 8 Overhaul Costs I Bese Operatir g Costs ------- -------- <br /> I ~ <br />; <br />P Overhaul <br />Field Re it <br />I I ~ I II <br /> I Depreciation CFC Overhead I Labor Pertsl Labor Parts I Fuel Lube Tires G.E.C. <br />___________ <br />Machine : ______________ <br />515.84 ______________ <br />f4.94 ___________ <br />f3.57 ________ <br />52.52 _________________________ <br />57.10 53.11 f5.74 _______ <br />f7.29 _____ ________ <br />f2.15 _______ <br />50.00 ________ <br />50.90 <br />Attachment X1 50.00 f0.00 50.00 50.00 50.00 50.00 50.00 50.00 f0.00 50.00 f0.00 <br />Rear Ripper f2.18 f0.57 50.53 50.28 50.78 50.47 50.81 f0.00 50.17 50.00 50.68 <br /> <br />LOST ADJUSTMENT FACTORS (CECG) I'i <br /> I ACOUI SITION COST BREAKDOWN ' <br />Factor Description <br />------------- Bese Value Adj. Value Multiplier I Cost Elements (CECG) Factor Ad Lost <br />----- <br />Acquisition cast -------------- <br />5225,240.00 -------------- <br />f171, 061.22 ------------ <br />0.759 I <br />I -----------------_-__--_ <br />Base purchase price _____--- ---_ <br />5225, -_-___- <br />240.00 <br />Econ. Life hours 9,550 9,545 1.001 I Less dealer discount 0.085 219, 745.40 <br />-attach. M1 8,800 8,800 1.000 I Plus freight 0.013 S2, 28.12 <br />Rear ripper 8,200 8,200 1.000 I Plus dealer charges• 0.005 51, 126.20 <br />Annual use hours 2,112 1,395 1.514 I •NLRD estimate ---- ----- <br />Mech. labor cost (24.78 (27.95 O.BBb I Adjusted purchase price 5270, 748.92 <br />Fuel f/gel. -gas f1.12 f1.12 7.000 I Plus taxes: Sales g 3X fb, 04.47 <br />-diesel f0.87 f0.87 1.000 I SMM 02X f4, 02.98 <br />Cube Lost f2.15 52.15 1.000 I Less tire cost 50.00 <br />Tire life hours N/A N/A 1.000 I Less salvage value 0.236 f49, 95.15 <br />Tire factor N/A N/A 7.000 I ---- ------ <br />Tire cost <br />__________________ N/A <br />______________ N/A <br />______________ 7.000 <br />____________ I <br />I Net acquisition cost <br />______________________-_ <br />------__ 5171, <br />___-_ 61.22 <br />_------ <br />ADJUSTED EW IPNENT COSTS <br /> I-------- Adjusted Ownership d Overhaul Costs ---------I------------- Adjusted Operat ing Cost s --- <br />__________________ <br />Acquisition Cost ______________ <br />573.69 _______________ <br />N/A ___________ <br />N/A ________ <br />N/A ________________________ <br />N/A N/A N/A ________ <br />N/A ____ _______ <br />N/A _______ <br />N/A ________ <br />N/A <br />Econ.life-Machine: 573.69 N/A N/A 52.52 57.10 53.11 f5.74 N/A N/A N/A N/A <br />-Rear ripper: N/A N/A M/A 50.28 f0.78 50.47 50.81 N/A I N/A N/A N/A <br />Anrwal usage 520.72 fB.34 fb.21 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts f15.54 54.17 53.70 N/A N/A N/A N/A N/A ~ N/A N/A N/A <br />Triple shifts (73.82 f2.7B f2.07 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mech. lbr-Machine: N/A N/A N/A f2.23 N/A f2.76 N/A M/A ~, N/A N/A N/A <br />-Rear Ripper: N/A N/A N/A f0.25 N/A 50.42 N/A N/A ~' N/A N/A N/A <br />Fuel/lobe-Machine: N/A N/A N/A N/A N/A N/A N/A f7.29 f2.15 50.00 50.90 <br />-Rear Ripper: N/A N/A N/A N/A N/A' N/A N/A f0.00 f0.17 50.00 50.68 <br />