My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC10473
DRMS
>
Back File Migration
>
Inspection
>
INSPEC10473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:12:05 PM
Creation date
11/18/2007 8:45:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986159
IBM Index Class Name
Inspection
Doc Date
3/30/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY tont'd <br />K. PORTAL/SXAFT SEALING <br />Task No.~ Task Description <br />L. DRILL HOLE/MONIiORf NG YELL SEALING <br />Task No.~ Task Description <br />sheet 4 of 4 <br />I <br />Cost (f) 'I <br />Subtotal (K): <br />Cost (S) <br />Subtotal (L): i <br />N. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (f) <br />________I_.._______________..________~_________.____________I_ ~~ <br />6 ~ Reseed Phase I Aree ~ fA,609 <br />Demolition <br />4 ~ Seeding ~ f4,609 <br />Fencing <br />5 ~ Mob/Demob ~ f763 <br />Subtotal (M): 59,981 <br />TOTAL D1REC7 RECLAMATION COSTS (subtotals A through M): f31, 815 <br />11. INDIRECT COSTS <br />:==eeeeeee ee...::::::er.vee....=:.eeeeeeeeeccc........eo::::::evvv.== I <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (f) ~, <br />___..~_I_________________~______________.._____________~.,I____._______ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ f493 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ 5310 <br />3. ~ Cont rec [or's Profit........... 10.00% of dir. ~ 53,182 <br />4. ~ Job Superintendent.. ~ ~, <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (dii <br />B. DNC PROJECT ADNI NI STRATTON E%PENSES <br />Item No.~ Item Description <br />_____~_~I__________________________________. <br />1. ~ Contract Prep., Eng. Fees..... <br />2. ~ Staff Admin. Expenses......... <br />Subtotal (A ): f3, 985 <br />act plus 0 8 P): 535,800 <br />Cost (f) <br />_______________I___________ <br />4.25% of cntr.~ 51,521 <br />0.75% of cn[r.~ f268 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): 51,790 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f5, 775 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 537,590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.