My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC10462
DRMS
>
Back File Migration
>
Inspection
>
INSPEC10462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:12:05 PM
Creation date
11/18/2007 8:45:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
5/24/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person CAM MINING, LLC Number C-004-80 Date 05/24/2007 Continuation Page <br />28. Performance Sta <br />3=Not Planned, 4=Not Started, S=Nonco <br />A. <br />Administrative <br />1. 1 Mining within Valid Permit <br />2. ] Mining within Bonded Area <br />3. 1 Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />5. 1 Ownership and Control <br />6. 1 Temporary Cessation <br />7. 1 AML Rec. Fees --Non-Respondent <br />8, 1 AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br /> 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. ] Siltation Structures <br />4. 1 Discharge Structures <br />5. ] Diversions <br />6. 1 Effluent Limits <br />7. 7 Ground Water Monitoring <br />8. 1 Surface Water Monitoring <br />9. 3 Drainage --Acid-Toxic Materials <br />10. 1 Impoundments <br />11. 3 Stream Buffer Zones <br />To psoil & Subsoil <br />1. 1 Removal <br />2 T Substimte Materials <br />3. 1 Storage and Protection <br />4. 1 Redistribution <br />C. <br />Backtilling & Grading <br />]. 1 Exposed Openings <br />2. 1 Contemporaneous Reclamation <br />3. 1 Approximate Original Contour <br />4. 1 Highwal] Elimination <br />5. 1 Steep Slopes (includes downslope) <br />6. 3 Handling of Acid R Toxic Materials <br />7. 1 Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1. 3 Placement <br />2. 3 Drainage Control <br />3. 3 Surface Stabilization <br />4. 3 Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1. 1 Drainage Control <br />2. 1 Surface Stabilization <br />3. 1 Placement <br />4. 1 Inspections and Certifications <br />5. I hnpounding Structwes <br />Use Of Explosives <br />1. 3 Blaster Certification - <br />2. 3Distance Prohibitions <br />3. 3 Blast Survey/Schedule - <br />4. 3 Warnings & Records <br />5. 3 Contro] of Adverse Effects - <br />E. <br />F. <br />G. <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br />A. Administrative .................................................... ..................... <br />1. Valid Penni[ .......................................................................... ...........773.11 <br />2 . Mining within Bonded Area ...................................... ..........773.11 <br />3 . Terms & Conditions of Permit ................................... ..........773.17 <br />4. Liability Insurance ...................................................... ..........800.60 <br />5. Ownership and Control .............................................. ..........775.13 <br />6. Temporary Cessation ..............................842.1 1(e) & 816/817.131 <br />7. AML. Rec. Fees --Non-Respondant ........................... .....870.15(b) <br />8 . AML Rec. Fees -- Failure to Pay ................................ .....870.15(a) <br />ories <br />where, 6=Previously Cited <br />3 Subsidence Control Plan <br />Roads <br />1. 1 Road Construction <br />2. 1 Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5. 1 Reclamation <br />Signs & Markers <br />]. 1 Signs <br />2. 1 Markers <br />1 Distance Prohibitions <br />Revegetation <br />1. 1 Vegetative Cover <br />2. 1 Timing <br />1 Postmining Land Use <br />Other <br />H. <br />I. <br />J. <br />K. <br />L. <br />M. <br />N. <br />General <br />Performance <br />Catagory <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ............................................................... ............................71(e) <br />2. Drainage Control ................................................... .............................71(f) <br />3. Surface Stabilization .............................................. .............................71(g) <br />4. Inspections &Certifications ................................... ............................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(g16/817.81-84) <br />1. Drainage Control ................................................... ............................83(a) <br />2. Surface Stabilization .............................................. ............................83(b) <br />3. Placement ............................................................... ............................83(c) <br />4. Inspections and Certifications ................................ ...........................83(d) <br />5. Impounding Structures ........................................... ................................84 <br />B. Hydrologic Balance ......................................(816/817.41-57) <br />G. Use of Explosives ..................................................(816/817.61-68) <br />1. Drainage Control ............................................ .............................45 <br />2, Inspections &Certifications ........................... ..................49(a)(10) <br />3. Siltation Structures ......................................... .............................46 <br />4. Discharge Structures ..................................... ..............................47 <br />5. Diversions ...................................................... .............................43 <br />6. Effluent Limits ............................................... .............................42 <br />7, Ground WaterMonitoring ............................. .........................41(c) <br />8. Surface Water Monitoring ............................. .........................4](e) <br />9. Drainage--Acid-Toxic Materials .................. .........................41(f) <br />10. Impoundments ............................................... .............................49 <br />11. Stream Buffer Zones ...................................... .............................57 <br />C. Topsoil &Subsoil ...............................................(816/817.22) <br />1. Removal ..................................................................................22(a) <br />2, Substitute Materials .................................................................22(c) <br />3. Storage and Protection .............................................................22(c) <br />4. Redistribution ..........................................................................22(d) <br />D. <br />1. <br />2, <br />3. <br />4. <br />5. <br />6. <br />7. <br />1. Blaster Certification ......................................... ..................................61(c) <br />2. Distance Prohibitions ....................................... ..................................61(d) <br />3. Blast Survey/Schedule ...................................... .................................62-64 <br />4. Warnings & Records ........................................ ..............................66 & 68 <br />5. Control of Adverse Effects ............................... ......................................67 <br />H. Subsidence Control Plan .........................................(817.]21-122) <br />I. Roads .................................................................(816/817.150-151) <br />1. Road Construction ...........................................................................150(c) <br />2. Certification ......................................................................................151(a) <br />3. Drainage ...............................................................................150{b)-151(d) <br />4. Surfacing and Maintenance ..................................................I50(e)-151(d) <br />5. Reclamation ......................................................................................150(f) <br />J. Signs & Markers .......................................................(816/817.11) <br />1. <br />2. <br />Backfilling & Grading ..............................(816/817.95-107) K <br />Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 L <br />Contemporaneous Reclamation ......................... ........_...............100 ' <br />Approximate Original Con[our .......................... ................102(a)(7) ]~ <br />2 <br />Highwall Elimination ........................................ .................102(a)(2) <br />~ <br />Steep Slopes (includes downslope) ................... .........................107 M, <br />Handling of Acid & Toxic Materials ................. .....................102(c) <br />Stabilization (rills and gutlies) ........................... .......................95(b) <br />Signs .................................................................... .................11(a),(b),8=(e) <br />Markers ............................................................... .......11(a),(b),(d),(e),&(f) <br />Distance Prohibitions ................................ .......................(761.11) <br />Revegetation .............................................. ....... (816/817.111-116) <br />Vegetative Cover ................................................. ......................111 & 1 ]6 <br />Timing ................................................................. ................................. l 13 <br />Postmining Land Use ................................ ..............(816/817.133) <br />Page 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.