Laserfiche WebLink
III. Comments - Comaliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules and <br />Regulations, and the permit also are identified below. <br />The operator had constructed a berm around the perimeter of the bench to <br />prevent Drainage off of the bench. <br />The operator had cut a diversion ditch above the facility. <br />The operator was finishing installation of the emergency spillway on the <br />sediment pond. <br />Urainaye from the disturbed area was being contained on-site. <br />To soi 1 , <br />The operator was constructing a berm around the topsoil stockpile. <br />Topsoil from excavating the diversion above the facility will need to be <br />placed in the stockpile. <br />