My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC10353
DRMS
>
Back File Migration
>
Inspection
>
INSPEC10353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:11:58 PM
Creation date
11/18/2007 8:45:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
7/20/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Bond Compliance Inspection <br />20 July 2004 <br />Location/Facility ~ DMG Dimension Permit Dimension Comments <br /> <br />PONDS <br />MB-1 1.50 acres 1.85 acres OK -Perimeter walked probably different <br />M8-4 0.04 acres 0.05 acres OK <br />MB-5 0.22 acres 0.31 acres OK <br />Sylvester Gulch _ <br />0.49 acres 0.43 acres OK <br />Refuse Pile Expansion -East Cell 0.81 acres 0.75 acres OK <br />Refuse Pile Expansion -West Cell 0.47 acres 0.43 acres OK <br />Freshwater 1.06 acres 0.96 acres OK <br /> <br />Coal Stockpiles <br />Main Stockpile 5.69 acres 5.28 acres OK <br />ST-4 Stockpile 2.56 acres 2.58 acres OK <br /> <br />Roads <br />_Sylvester Gulch Haul Road 10,035 feet 9,950 feet OK <br />Main Mine Access Road 2,920 feet 3,030 feet OK -Discrepancy Probably Due to StaNFinish Point <br />RPE Haul Road 1,511 feet 1,400 feet OK -Discrepancy Probably Due to StartlFinish Point <br />RPE Road to RPE Pond 946' 950' OK <br />Shaft #3 Light Use Road 2,742 feet 2,730 feet OK <br />SG-1 Light Use Road 650 feet 660 feet OK <br />LRP Access Road to Hwy 133 2,511 feet 2,500 feet OK <br />Light Use Road to Water Tank 402 feet 340 feet OK -Discrepancy Probably Due to StarUFinish Point <br />Light Use Road to Trash Compactor 560 feet 530 feet OK <br />Upper Mine Access/Haul Road 1,739 feet 1,710 feet _ OK <br />MSB Access Road 440 feet 395 feet OK -Discrepancy Probably Due to StarUFinish Point <br />Light Use Road -MSB to Portals 1,304 feet 1,340 feet OK <br />Light Use Road above Portals 469 feet 475 feet OK <br /> <br />Pads and Benches <br />Parking Lot 1.35 acres 1.42 acres OK <br />_Sylvester Gulch Substation 1.25 acres 1.36 acres OK <br />LRP Storage Area 4.09 acres 4.0 acres OK <br />Material Storage Bench (MSB) 3.45 acres 3.18 acres OK <br />Sylvester Gulch Shaft Laydown Area 1.15 acres 1.17 acres OK <br />S Ivester Gulch Fan Pad 1.54 acres 1.58 acres OK <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.