Laserfiche WebLink
• <br />`s <br />iii iiiiiiiiiiiiiiii <br />D EP~RiltEMi OF `:47URAL RESGURCEi <br />7. Mcn;e Psto., Esee~pve J.r.e:or <br />.lIL\ED L.-~\D REI;L.a_ll.~'TIO~ <br />=20 Cantenmat 8uiitlmg, t 3 t3 Sherman Street <br />Oenver, Coloraoa 80203 Tei. i300i866-3567 <br />David C. Shelton <br />Director <br />NOTICE OF INSPECTION <br />.~,~ID <br />INSPECTION REPORT <br />I1SIE dF Il75PECTIQV: December 9, 1981 <br />Ne4JE OP OPERATOR: Park County, Bob Freitag <br />dDDRESS: Box 147 <br />Fairplay, CO 80440 <br />RE: FIIE NO.: 80-I2 ,$g; Valley of the Sun Pit <br />(Please note the instructions indicated by <br />an K to the right.) <br />Photos 18-21 <br />Cj' Yo problems noted ac time of inspection. <br />As a reminder, be sure ca file your <br />Annual Report or Notice of Intent co <br />Continue on the Permit Adniversary Data <br />2ossible problem(s) - Note recommenda- <br />tion(s) below to avoid further compllca <br />[ions or possible violation(s) ac thz <br />time of the next inspection. <br />Possible violation(s) - Note recommeada <br />tun(s) below and reply to the Division. <br />by to avcid <br />enforcement action. <br />Possible violation(s) pose(s) an <br />immediate threat of harm to the <br />environment, public welfare, at <br />continued operation. Enforcement: <br />action iorthcomin3. <br />O&SERUATICi`15 OF L`1PORTAN(.T <br />1. Headward advance of excavation is undermining topsoil stockpile above pit. <br />Topsoil is not being salvaged from new workings -- observed topsoil being run <br />with gravel. <br />2. Runoff settling basin has not yet been constructed. <br />REIA~."~ID.4r'-IC~75 <br />1. A11 topsoil must be moved away from workings and stockpiled in a protected <br />Location, stabilized per agreement. <br />2. Construct settling basin andjor runoff diversion. <br />L-u-Pecc.~ci by: ~' U pl /~ c~ <br />Reclasatlon Soeczt~t <br />Mike Stanton <br />MS:ys <br />