Laserfiche WebLink
,- • <br />•1 <br />h ~ <br />III. Comments - ComPllance <br />Below are particular Issues with regard to any of the <br />compliance items. Enforcement actions resulting from failure <br />to comply with the Act, Rules and Regulations, and the permit <br />also are identified below. <br />1. Only minor inflows were seen in the mine. There were <br />no measureable flows only seeps and drips from roof bolts. <br />Standing water was very low, about one foot near the face. <br />2. The question of Emissions Permits mentioned in my <br />January Inspection Report has been resolved. Anew permit from <br />APCD has been requested that specifically includes the coal <br />stockpile. <br />3. Pond certification has been delayed due to snow cover <br />that limits access and observations. An extention on <br />completion was granted. <br />4. The question of drainage on the corner of the office <br />pad was discussed. This area needs to be graded to limit <br />runoff down the access road. Truck traffic has caused the <br />grade to change. The operator will regrade the area again but <br />was warned that if this problem reoccurs a more permanent <br />solution will need to be devised. <br />