Laserfiche WebLink
<br />III. Comments - Compliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules <br />and Regulations, and the permit also are identified below. <br />1. . No drainage or coal spillage problems were noted at the truck <br />scale. <br />2. The drainage control system was very well maintained. <br />Drainage, particularly on the access road to the mine bench, was well <br />established with little or no debris. <br />3. .The water level in Hubbard Creek has dropped considerably, no <br />erosional problems were noted along the pond #1 embankment. <br />4. The operator has reestaolished the mine water drainage on the <br />portal bench. Some surface runoff drainage needs to be completed. <br />5. The culvert from the access road switchback leading to the <br />check dam heeds several sleeves and a proper entrance configuration. <br />This needs to be completed this swniner. <br />