Laserfiche WebLink
<br />I11. Comments - Compliance <br /> <br />below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules and <br />Regulations, and the permit also are identified below. <br />Siyns and Markers <br />No perimeter markers could be located. If the perimeter has not been marked, <br />it must be done as soon as possible. See 4.0"L. 3. <br />Roads <br />Road were being maintained. T1,e operator noted the difficulty of road <br />maintenance due to recent wet weather. <br />Attention will be needed for Ditch maintenance later this spring. <br />Hydrologic Balance <br />All surface drainage appeared to be passing through the sediment control <br />system. <br />One problem was noted regarding the drainage culverts below the mine bench. <br />The last three sections of the 10" culvert had become disconnected. These <br />should be reconnected. Drainage from these culverts was contained in the <br />diversion ditch and was flowing into pond No. 2. <br />