Laserfiche WebLink
<br />III. COMMENTS -COMPLIANCE ~C C ~ ,~~~~~ <br />~ % ~Tn-~. aooi ~ <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the GEC mine conducted by Jim Stark of CDMG. The <br />bond for this site has been forfeited and reclamation was completed by DMG. The <br />weather was hot and sunny and the ground was dry. <br />The access road to the East and West Pit areas was a little rutted but in overall good <br />condition. The East Pit drainage was in good shape. The riprap that was placed in <br />the two gullies below the road and the top of the drainage appears to be stable and <br />is beginning to fill in with sediment. Both the East and West Pit areas seemed to be <br />well vegetated and in good shape. <br />The Orphan Pit, Tipple and Duck Pond areas were appeared to be well vegetated <br />and in good condition. The road to these areas is the Corley Mountain Ranch Road. <br />This road is well maintained and in good condition. <br />Chen's Hill has some gullying but appears to be well vegetated and stable. <br />Overall the site is in good condition. <br />