Laserfiche WebLink
(Page 4) <br />MINE ID # OR PROSPECTING ID # M-1977-020 <br />INSPECTION DATE 2-18-2004 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 ~ Excavation has enrroarhed loser than 200 feet to permanent man-made structures for whirh a <br />damage waiver agreement or an engineering demonstration of stability has not been submitted. 04 / 19 / 2004 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): BG <br />Adeeuatelv backfill these areas of excavation encroachment and Drove, through accented <br />engineering demonstrations, that those nit slooes are adequately stabilized to orevent damage to the <br />subject structures. <br />2 <br />slooes and poor revegetation surreys 04 / 19 / 2004 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): RV <br />The slopes of this berm must be reduced to a grade of 3H:1 V. fertilized per the soil analysis from 1.5 _ _ _ <br />years ago. mulched and seeded. Submit photographic evidence of compliance by the correction date <br />shown. <br />3. None. <br />/ / <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): <br />I, Steve Shuey, hereby certify that on February 27, 2004, I deposited a true and complete copy of this foregoing inspection <br />report in the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, and to <br />those others within the body of this report who have been designated to receive copies (DMG personnel excepted). <br />