Laserfiche WebLink
• ~ <br />„ ' RED CANYON <br />LIYIiEO LIAIIIIiT COYIAMT <br />3131 Barrett Road <br />Colorado Springs, CO 80926 <br />(719) 576-0563 <br />09 Oct, 1999 <br />Mr. James Dillie <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Corrective Action Submittal, Red Canyon Quarry, M-85-093. <br />Dear Mr. Dillie: <br />iii iiiiiiiiiiiii iii <br />999 <br />~~; <br />Divi~pn p~M'~~~ G~ <br />OAT ~cF~~FO <br />'~D-~~~M; ~ 1898 <br />~~~~~~ <br />This confirms our telephone conversation of today concerning your letter of 19 <br />September, 1999. On or just prior to the 9th of August, 1999, Rob Mangone of Rocky <br />Mountain Materials and Asphalt, Inc., called you and asked for an extension on our 9 <br />August suspense date for our watershed analysis report as we were having problems <br />determining what a "two year rain event" was. During this conversation with Rob you <br />extended our suspense date until the 28'" of September, 1999. <br />You stated you had received our watershed analysis prior to the 28 September <br />suspense date and you had not studied it in great detail to date. We hope our plan <br />is satisfactory and meets the requirements of the State. If we don't here from you, <br />we will assume the watershed analysis is satisfactory. <br />Respectfully, <br />ert C. Stack <br />Manager, R.C.L.L.C. <br />