My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC09664
DRMS
>
Back File Migration
>
Inspection
>
INSPEC09664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:10:52 PM
Creation date
11/18/2007 8:42:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Inspection
Doc Date
1/3/2005
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
8/4/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person COAL BASIN Number C-81-017 Date 0810412000 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified E sewhere, 6=Previously Cited <br />IB- <br />I C. <br />L _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />1. 2 Drainage Control <br />2._ Inspections & Certifications <br />3.? Siltation Structures <br />4. Discharge Structures <br />5 _ Diversions <br />6.v Effluent Limits <br />7._ Ground Water Monitoring <br />8._ Surface Water Monitoring <br />9._ Drainage -- Acid-Toxic Materials <br />10._ Impoundments <br />11._ Stream Buffer Zones <br />Topsoil & Subsoil <br />1._ Removal <br />2._ Substitute Materials <br />3.` Storage and Protection <br />D. Backiilling & Grading H. <br />Subsidence Control Plan <br />1 ._ Exposed Openings _ <br />I <br />Roads <br />2 ., Contemporaneous Reclamation . <br />L <br />Road Construction <br />3 ._ Approximate Original Contour _ <br />2. Certification <br />4 ._ Highwall Elimination 3._ Drainage <br />5 ._ Steep Slopes (includes downslope) 4._ Surfacing and Maintenance <br />6 ._ Handling of Acid & Toxic Materials 5. <br />Reclamation <br />7 ._ Stabilization (rills and gullies) , <br />J, Signs & Markers <br />E. Excess Spoil Disposal 1. <br />Signs <br />1 ._ Placement _ <br />2. <br />Markers <br />2 ._ Drainage Control _ <br />K. Distance Prohibitions <br />3 <br />4 ._ Surface Stabilization <br />. Inspections & Certifications - <br />L. Revegetation <br />F. C oal Mine Waste 1._ Vegetative Cover <br /> (Refuse Piles/Impoundments) 2._ Timing <br />1 .~ Drainage Control M. _Postmining Land Use <br />2 . Surface Stabilization N. Other <br />3 ._Placement General <br />4 ._ Inspections and Certifications Performance <br />5. _ Impounding Structures Category <br />G. U se Of Explosives 1) <br />1. _ Blaster Certification _ <br />2. _ Distance Prohibitions 2) <br />3. _ Blast Survey/Schedule _ <br />4. _ Warnings & Records 3) <br />5. Control of Adverse Effects , <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br />A. Administrative .................................................... ..................... <br />I. Valid Permit ..............................._....__.._..._....................... ...........773.11 <br />2. Mining within Bonded Area ...................................... ..........773.11 <br />3 . Terms & Conditions of Permit ................................... ..........773.17 <br />4. Liability Insurance ...................................................... ..........800.60 <br />5. Ownership and Control .............................................. ..........778.13 <br />6. <br />7. Temporary Cessation ..............................842.1 I (e) & <br />AML Rec. Fees -- Non-Respondent ........................... 816/817.131 <br />.....870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ................................ .....870.15(a) <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placemenc .............................................................. ............................71(e) <br />2. Drainage Conuol ................................................... .............................7I(f) <br />3. Surface Stabilization .............................................. .............................7](g) <br />4. Inspections & Certifications ................................... ............................71(h) <br />F. Coal Mine Waste (Refuse Piles~impoundments) ,,,,,(g16/817.81-84) <br />I. Drainage Control ................................................... ............................83(a) <br />2. Surface Stabilization .............................................. ............................83(6) <br />3. Placement ............................................................... ............................83(c) <br />4. Inspections and Certifications ................................ ...........................83(d) <br />5. Impounding Structures ........................................... ................................84 <br />B. Hydrologic Balance ......................................(816/817.41-57) <br />G. Use of Exalosives ..................................................(816!817,61-68) <br />1. Drainage Connol ............................................ .............................45 <br />2. Inspections &Certifications ........................... ..................49(a)(10) <br />3. Siltation Structures ......................................... .............................46 <br />4. Discharge S[mctures ..................................... ..............................47 <br />5. Diversions ...................................................... .............................43 <br />6. Effluent Limits ............................................... .............................42 <br />7. Ground Water Monitoring ............................. .........................41(c) <br />8. Surface Water Monitoring ............................. .........................41(e) <br />9. Drainage--Acid -Toxic Materials .................. .........................41(1) <br />10. I mpoundments ............................................... .............................49 <br />11. Sueam Buffer Zones ...................................... .............................57 <br />Topsoil &Subsoil ...............................................(8161817.22) <br />1. Removal ............................................ ......................................22(a) <br />2. Substitute Mate»als ........................... ......................................22(c) <br />3. Storage and Pro[ectioa ...................... ......................................22(c) <br />4. Redistnbution .................................... ......................................22(d) <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />1. Blaster Certification ............... ............................................................61(c) <br />2. Distance Prohibitions ............. ............................................................61(d) <br />3. Blast Survey/Schedule ........... ............................................................62-64 <br />4. Warnings & Records ............. .........................................................66 & 68 <br />5. Control of Adverse Effects .... .................................................................67 <br />H. Subsidence Control Plan .........................................(817.121.122) <br />I. Roads ................................ .................................(816!817.150-151) <br />1. Road Construction ................. ..........................................................150(c) <br />2. Certification ........................... ...........................................................Isl(e) <br />3. Drainage ................................. ..............................................150(6)-151(d) <br />4. Surfacing and Maintenance .... ..............................................150(e)-151(d) <br />5. Reclamation ........................... ...........................................................150(1) <br />J. Signs & Markers .......................................................(8161817.11} <br />1. Signs .....................................................................................11(a).(b),&(c) <br />2. Markers ...................................................................._tl(a)db)•(d),(e),&(fl <br />Backfilling & Grading ..............................(816/817.95-107) K <br />Exposed Openings ..................:..816/817.13, 14, I5, & 823.11 & 21 L <br /> <br />Contemporaneous Reclamation ......................... . <br />.........................100 <br />1 <br />Approximate Original Contour .......................... ................102(a)(1) <br />~ <br />Highwall Elimination ......................................... ................102(a)(2) 2. <br />Steep Slopes (includes downslope) .................... ........................107 M, <br />Handling of Acid & Toxic Materials ................. .....................102(c) <br />Stabilization (rills and qu!lies) ........................... .......................95(6) <br />Distance Prohibitions .......................................................(761.11) <br />Revegetation .....................................................(816!817.111-116) <br />Vegetative Cover .................................. .....................................111 & t L6 <br />Timing .................................................. ................................................ l 13 <br />Postmining Land Use ................... ...........................(816/817.133) <br />Page 2 of _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.