Laserfiche WebLink
CIRCES Cost Estimatirta Software <br />PROJ EC71 DENTI FICATION <br />Task # : 05a <br />Date : 03/06/2002 <br />User: SSS <br />State :Colorado <br />County :Mesa <br />Site :WhitewaterPit <br />Permit/job#.: M-1998-084 <br />Abbreviation :none <br />Filename : M084-05a <br />Agency or organization name :DMG <br />Permit or other job action :Routine Reclamation Cost Estimate Update <br />Task description :Replace topsoil over 17.6 acre stockpiie/processing area <br />---- ~ ~~_ __._~_ ._~_ _ _ _ ~__ , .__ _____ _______ ~a <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat OtOR - IOSU Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank dpper <br /> Data source : (CRGJ <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $74.00 NA <br />OperatingcosVhour : $125.73 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator costfiour : $27.99 NA <br />Total unit cosVhcur <br />r--.,_ -~____~~... _ : $227.71 Total Fleet cosVhour : <br />_ _ $227,71 <br />j _.___ ~ ~ ~ ~. __________~ <br />MATERIAL QUANTITIES __.~ T_ ._ ~ ~___ ~ ~ ~______ __ ___ <br />Initial Swell Loose <br />volume : 14,197 LCY factor : NA volume : 14,197 LCY <br />Source of estimated volume :Assume 17.6 acres covered with 6" of <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Partly consolidated stockpile <br />200 feet <br />946.0 LCYlhr <br />Average push gradient : 0.00 % (I <br />Average site altitude : 4,655 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />Job Condition Correction Factors u _ Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.10 (Cat HB <br />Dozing method : f.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shiRfda <br />Spoil pile ; 0.70 (fid-m1J <br />li Push gradient : 1.00 (Cat HB, <br />~ Altitude : 1.00 (Gat HB, <br />Material weight : 1.44 (Cat HB; <br />Blade type : 1,00 (SfSUAI, <br />Net correction : 0.69 <br />Adjusted unit production <br />Adjusted fleet production <br />651.59 LCY/hr <br />651.59 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer{s) Total job time : 21.79 Hours <br />Unit cost : $0.349 /LCY Total job cost : $4,962 <br />`.~ _ _ ._ _~ __ .~._._.___ .~ _.__ ,_ ,_w ,_ ____, _ _____ _._ _._ _ __._.__._ .~ _ m »__ _ _~:v <br />