My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC09601
DRMS
>
Back File Migration
>
Inspection
>
INSPEC09601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:10:50 PM
Creation date
11/18/2007 8:41:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998084
IBM Index Class Name
Inspection
Doc Date
3/11/2002
Doc Name
Inspection Report
From
DMG
To
Grand Junction Pipe & Supply Co.
Inspection Date
2/14/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~t~'~`E~ CDFrrt~~ <br />~iJB~ C06'Y <br />r+a:~-t4Wfi-o8`~ <br />~c cJkrkw~f~ P~f <br />AMlont Znsnt~ f ~.i_ <br />CIRCES Cost Estimating Software <br />Date <br />User <br />06-Mar-2002 <br />Permitorjob no.: M-1998-084 <br />Abbreviation : none <br />Filename : M084-000 <br />SSS <br />Agency or organization name :DMG <br />Permit or job action :Routine Reclamation Cost Estimate Update <br />.~.._.._.w.- ._ u_.._~..____ ~_~_ _.__ _ __~_ <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION __------ <br />FORM FLEET <br />USED SIZE <br />TASK <br />HOURS <br />DIRECT <br />COST <br />Ola -Demolition and on-site disposal of man-made structures <br />02a -Backfill highwall with stockpiled overburden demolish 1 <br />dozer 1 80.0 <br />105.51 $8,314 <br />$24,026 <br />03a -Rip and grade stockpile/processing area dozer 1 19.6 $4,541 <br />04a -Replace topsoil on pit slopes above water level dozer 1 0.5 $114 <br />05a -Replace topsoil over stockpile processing area dozer 1 21.7 $4, 962 <br />06a -Revegetate pit slopes and stockpile/processing area revege 2 80.0 $17,360 <br />07a -Transport reclamation equipment to/from site mobilize 5 2.8 $1,826 <br />08a -Dewaterpitforhighwallbackfilloperations pumping 1 178.9 $5,419 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 489.2 $66,562 <br />includes inflation tailor atljustmenl of : NA % TOTAL DIRECT COST' _ $66,562 <br />~._-<- _____.v--mod.-_ .~.. <br />INDIRECT COSTS <br />OVERHEADAND PROFIT- Liability InSUfanCe : 1.55 ~ Of d%/CCt total = ~ $1,032 <br />Performance bond : 1.05 °k of direct total = $699 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % ofdirect total = $6,656 <br />`nof required (w eqp. operator serves as super) TOTAL O R P = ,$8,387 <br /> CONTRACT AMOUNT (aired+O&P)= $74,949 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 °k ofcntr. NA total = $3,747 <br />CONTINGENCY- NA' NA total = NA <br />`contlngencies accounted for at task/eve/ TOTAL INDIRECT COST= $12,134 <br />TOTAL BOND AMOUNT {direct + indirect) _ $78,696 <br />Site : Whitewater Pit <br />State :Colorado <br />County :Mesa <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.