My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC09477
DRMS
>
Back File Migration
>
Inspection
>
INSPEC09477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:10:39 PM
Creation date
11/18/2007 8:41:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989084
IBM Index Class Name
Inspection
Doc Date
3/22/2006
Doc Name
Inspection Report
From
DMG
To
Griffin Ranch LLC
Inspection Date
3/16/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinsl Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 03/20/2006 <br />User : CMR <br />State :Colorado PermiUjob # : M-1989-084 <br />County :Fremont Abbreviation :none <br />Site :Oak Creek Gravel Pit Filename : M-1989-084-001 <br />Agency or organization name ;DMG <br />Permit or other job action ; Succession of Operator <br />Task description :Rip Pit Floor <br />,. <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes ll <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $54.16 NA <br />Dozer operating cost hour : $75.57 100 <br />Ripper operating cost/hour : $7.98 100 <br />Operator cosUhour : $32.53 NA <br />7otalunitcosVhour : $170.24 TotalfleetcosUhour: x170.24 <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA load factor <br />Area : 15.00 acres Rip depth (ft) <br />8U <br />Selected estimating method : Area <br />NA Bank volume <br />1.00 Volume <br />NA <br />24,200 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Revised Reclamation Plan <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeVsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,326.18 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feeVpass Site altitude : 7,800 feet <br />Average ripping width : 708 feeVpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 500.00 feeVpass Job efficiency factor : 0.83 (1 shiff/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.822 acres/hour Adjusted unit production : 1,100.73 cu. yds./hour <br />Unadjusted production : 1,326.18 cu. yds./hour Adjusted fleet production : 1,100.73 cu. yds./hour <br />JOB TIME AND COST ~ ~~~~~~~~ ~~~~~~ <br />Fleet size : 1 dozers) Total job time : 21.99 hours <br />Unit cost : $0.155 per cu. yd. Total job cost : x3,743 <br />
The URL can be used to link to this page
Your browser does not support the video tag.