Laserfiche WebLink
Page 4) <br />site in the area near the main gate. A water quality protection plan is required if the mine is expected to effect <br />surface water (Mineral Rules and Regulations 6.4.7(2)(c)). The lack of a Sediment Control Structure is a <br />problem that will need to be corrected. <br />The problems, corrective actions, and correction by dates listed below are attached to the permit regardless of <br />the operator, and therefore can be addressed by either operator. <br />The succession of operator and transfer of permit will be approved pending the submission of a new <br />performance warranty and with a new financial warranty of $59,732.00. The cost estimate is included for your <br />review. This concluded the inspection. <br />I & E Contact Address <br />NAME: Oak Creek Gravel Pit <br />OPERATOR: Griffin Ranch LLC <br />STREET: <br />CITY/STATE/ZIP: <br />cc: Daniel Russell, Rockbottom LLC <br />^ CE <br />^ BL <br />^ FS <br />^HW <br />^HMWMD (CH) <br />^ SE <br />X WQCD (CH) <br />^ OTHER <br />