My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC09313
DRMS
>
Back File Migration
>
Inspection
>
INSPEC09313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:10:30 PM
Creation date
11/18/2007 8:40:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
12/12/2005
Doc Name
Compliance With 12/1/05 Letter
From
Dan Hernandez
To
David Berry
Inspection Date
11/15/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ahead of our 12/2/05 letter. DMG sent an adequacy letter to MCC on 11/23/05. MCC <br />submitted their responses on 12/6/05. DMG is reviewing these responses. <br />Measure #2: Submit an IBR TR to the West Elk Mine Permit for the Lay-Down Area <br />Due Date: 12/16/05 <br />Status: Not Yet Complied With <br />MCC was directed to submit an Incidental Boundary Revision (Technical Revision) to the <br />West Elk Mine permit. MCC submitted a partial draft by e-mail to DMG on 12/9/05; it was <br />however, very incomplete. MCC continues to work on this. <br />Measure #3: Submit Analyses Conducted of Any Previously-Collected Water Samples <br />Due Date: 12/6/05 <br />Status: Complied With By Exception <br />MCC was directed to provide any water quality sample results already obtained by MCC <br />downstream of the 11/12/05 incident. MCC had not obtained any water quality samples <br />downstream of 11/12/05 incident until directed to do so via DMG's letter of 12/1/05. <br />Measure #4: Conduct New Water Quality Sampling <br />Due Date: 1216!05 <br />Status: Complied With Ahead of Due Date <br />MCC was directed to conduct water sampling at certain intervals in the Dry Fork of <br />Minnesota Creek and in Minnesota Creek below its confluence with the Dry Fork. Sampling <br />was conducted on 12/2/05, according to a report submitted by MCC on 12/6/05. <br />Measure #5: Submit Analyses of New Water Quality Samples <br />Due Date: 12/9/05 <br />Status: Complied With Ahead of Due Date <br />MCC was directed to submit analyses of the water samples collected. The analyses and an <br />evaluation were provided to DMG on 12/6/05 in a document entitled "Draft Technical Memo <br />RE: SILV-EX Spill Monitoring Repor[". DMG has reviewed the analyses and the evaluation, <br />and documented its review in a memo dated 12/9/05. <br />Measure #6: Secure and Contain Materials at Lay-Down Area <br />Due Date: No Date Specified <br />Status: Continuously Monitored <br />MCC was directed to "continue to ensure that all materials used in support of the MCC <br />operations remain secure and properly contained". DMG will monitor compliance with this <br />measure during future I&E inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.