Laserfiche WebLink
Richard D. Lamm <br />Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Catches, Executive Director <br />MINED LAND RECLAMATION DI\ <br />DAVID C. SH ELTON, DlreMOr <br />Operation: <br />File No.: <br />Operator Name: <br />Permittee Name <br />Address: <br />County: <br />Inspection Date <br />Type of Operation: <br />Inspector: <br />lJeather: <br />Time: <br />Type of Inspection <br />Operator Contact: <br />COAL INSPECTION REPORT <br />BLUE RIBBON <br />C-047-81 <br />Blue Ribbon Coal Company <br />Same <br />P.O. Box 58 <br />Delta, Colorado 81416 <br />Delta <br />February 14, 1985 <br />Underground, federal <br />Susan I4owry <br />Sunny, cool <br />9:45 - 10:45 a.m. <br />Partial <br />)~1r. Larry Reschke <br />I. General Comments <br />Bench construction continues to progress. Additional coal material iias been <br />cleaned up from along Hubbard Creek and moved to the s*_ockpile area next to <br />the guard shack.gpproxiinately 200 yards remain to be cleaned up. <br />Pond certification has been submitted as well as road and bench certification. <br />The operator is monitoring the level in the septic tank. The tank will be <br />pumped periodically to prevent it from overflowing. <br />Snow and ice was obscuri~ig some of the ditches and culverts. These had been <br />cleaned since last muntii, the operator indicated. All drainage is still being <br />controlled despite the snow and ice. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />