Laserfiche WebLink
. . <br />III. Comments - Compliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules and <br />Regulations, and the permit also are identified below. <br />Hydrologic Balance (4.05) <br />The collection ditch below the stockpile is apparently collecting drainage <br />from the reclaimed area above the stockpile in addition to drainage off the <br />stockpile. This drainage amount is excessive for the collection ditch and has <br />resulted in a breach in the ditch embankment, NOV C-84-165 was issued for the <br />breaching of the ditch. Measures to prevent excessive drainage from areas <br />other than the stockpile in the form of diversions should be taken. <br />General Compliance With Mine Plan <br />Reclamation activities are not being under taken nor has the operator <br />submitted a Letter of Temporary Cessation of Operations. Therefore NUV <br />C-84-164 has been issued. <br />