Laserfiche WebLink
~xYtbrer# ttxt.~ ~~~>~~~x~.e~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M00130MT <br />PROJECT NAME: West Elk Mine R.P.E. <br />PROJECT LOCATION: Somerset, CO <br />CLIENT: Mountain Coal Company <br />CONTRACTOR: Mountain Coal Company <br />DATE: Wednesday 6-21-00 <br />TECHNICIAN: Casias <br />WEATHER CONDITIONS: sunny <br />WORK REQUESTED: Density tests <br />FOREMAN: Henry Bazbe <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATNE (AND REMARKS) <br />I arrived at the project site at 11:30 a.m. as requested by Mr. Henry Barbe. I performed soil <br />density tests as requested by Mr. Barbe of material being placed for gob pile backfill using nucleaz <br />soil density test methods. Please refer to the test results sheets for approximate test locations and <br />test results. The test results were verbally given to Mr. Barbe of Mountain Cola Company at the <br />time of our site visit. The test results indicate only the relative compaction and soil moisture content <br />of the material tested at the elevation and location tested at the time of our site visit. <br />P.O. Box 3986 P.O. Box 0045 214 Bodo Drlve <br />Grand Junction, CO 81602 Montrose, CO 81402 Durango, CO 81301 <br />(970) 245~i508 (970) 249-2154 (970) T59.5095 <br />FAX• 19701 248-9758 FAX• (970) 249 3262 FAX: (970) 382-251 S <br />