Laserfiche WebLink
Item IE2 <br />The Company (Summit Brick) feels that the $6,500.00 Reclamation bond is adequate to cover <br />all the reclamation cost at this mice site. This mine site is just across the street from the main plant <br />and mobilization and demobilization cost are not a factor since the mine is in the back yazd so to <br />speak. Bringing waste brick materials aze not a factor since once loaded the haul is very short. The <br />waste brick is then covered with overburden generated from the ongoing mining. We therefore feel <br />that the costs that are allocated in the bond are justified. <br />In summary this Summit Brick has been at this industrial site for over I00 years and is family owned <br />and family run business. It is highly unlikely that as a company Summit Brick and Tile would fail to <br />meet its obligations to reclaim the mine site in the proper manner. We understand the states concern <br />but believe the $6,500.00 bond is sufficient. <br />If you have any more questions or need to re-inspect this site to solve the items mentioned above <br />please call me at (719) 240-9424 to arrange a site visit. <br />Sincerely, <br />I ~ <br />4 ~'~ <br />JOE GAGLIANO <br />Consultant <br />