Laserfiche WebLink
<br />(Page 2) <br />MINE ID # OR PROSPECTING ID #: M-~9Rn-744 <br />INSPECTION DATE: s-~a-m <br /> <br />INSPECTOR'S INITIALS: ~_ <br />The Division wnducted a monitoring inspection of the site on 5-24-O1. The main purpose of the inspection <br />was, to inspect the clay liner deployment to the 20 million-gallon pond being constructed South of the ARD <br />building as approved in TR-33. Present during the inspection were, Mr. Phil Barnes and Mr. Mark Tidquist of <br />CC&V. Inspected the pond, clay liner was being deployed, the clay lined area was walked and inspected no <br />problem noted. Golder QA/QC were on site, a brief discussion with Bob Nickels of Golder was held, <br />regarding the time frame for geo membrane deployment. He stated that at present the moisture content of <br />the deployed clay was higher than allowable and he does not foresee deployment until the 25"' or later. The <br />perimeter of the pond was walked and inspected, no problem noted. Continued the inspections to the phase <br />II are a pregnant solution collection system and recorded the following readings from the high and low <br />volume transducers. High volume solution collection transducer # 4 was recorded at 11.9, # 5 were <br />recorded at 16.6 and # 6 were recorded at 17.8. Low volume solution collection transducer # 1 was <br />recorded at .08 and # 2 were recorded at .Ol. (All measurements are in feet of hydrostatic head). <br />Inspected the phase III area, temporary storm water diversion structures and highway realignment work <br />was still continuing, according to Mark, the work should be completed by the end of the month. The existing <br />temporary storm water diversion structures in place were in good repair, no major problem noted. <br />After the inspection, a short meeting was held regarding the company's plan to style down the diversion <br />structure for the Phase III area as approved in Amendment # 8 to the phase IV area. Since the large <br />portion of the water shed will not be a factor for another five years, CCB:V wants to place a pond, at present <br />unknown capacity and size, in the phase III area, design and capacity to be provided at a later date. CCB:V <br />representatives were informed to add the changes a TR will have to be submitted or added to the pending <br />TR, if the capacity of the pond exceeds a certain design criteria. After the meeting assisted AML as <br />instructed by Jim Stevens. <br />I & E Contact Address <br />NAME: Scott Lewis <br />OPERATOR: CC&V <br />STREET: P.O.BOX 191 <br />CIiY/STATE/ZIP: _ VICTOR, CO ROR60 <br /> JAMES STEVENS <br />cc: ^ CE <br /> ^ BL <br /> ^ FS <br /> ^ HW <br /> ^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />^ OTHER <br />