My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-04-29_INSPECTION - M1978208
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1978208
>
2005-04-29_INSPECTION - M1978208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 11:10:25 AM
Creation date
11/18/2007 8:38:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978208
IBM Index Class Name
Inspection
Doc Date
4/29/2005
Doc Name
Insp Rpt
From
DMG
To
Aspen Enterprises
Inspection Date
4/21/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ID # OR PROSPECTING ID #: nn_te»_~m <br />INSPECTION DATE: e/~~!n5 INSPECTOR'S INITIALS: .~A!? <br />OBSERVATIONS <br />This inspection was conducted in response to questions the operator had for the Division of Minerals and <br />Geology regarding activity at the site. Present at the inspection were Kate Pickford, DMG, and Juliet <br />Weir, Aspen Enterprises. Weather at the time of the inspection was clear, calm, and approximately 50 <br />degrees. <br />2. The site is approved for up to 9.9 acres of disturbance, and the operation appears to be within that limit. <br />The site is nearly mined out, and the operator discussed some options as to the future of the operation. <br />The operator was advised of her options relative to the Construction Materials Rules and Regulations <br />I & E Contact Address Cc: ^ CE <br />^ BL <br />NAME: Juliet Weir ^ FS <br />^ HW <br />OPERATOR: Aspen Enterprises ^ HMWMD (CH) <br />STREET: 1~~R~ Wcimhlee Vnlley R~~nl ^ SE <br />CITY/STATE/ZIP: Cnnifar Cn Rn433 ^ WOCD (CH) <br />X Other: Harry Posey, DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.