Laserfiche WebLink
MINE ID # OR PROSPECTING ID #: nn_te»_~m <br />INSPECTION DATE: e/~~!n5 INSPECTOR'S INITIALS: .~A!? <br />OBSERVATIONS <br />This inspection was conducted in response to questions the operator had for the Division of Minerals and <br />Geology regarding activity at the site. Present at the inspection were Kate Pickford, DMG, and Juliet <br />Weir, Aspen Enterprises. Weather at the time of the inspection was clear, calm, and approximately 50 <br />degrees. <br />2. The site is approved for up to 9.9 acres of disturbance, and the operation appears to be within that limit. <br />The site is nearly mined out, and the operator discussed some options as to the future of the operation. <br />The operator was advised of her options relative to the Construction Materials Rules and Regulations <br />I & E Contact Address Cc: ^ CE <br />^ BL <br />NAME: Juliet Weir ^ FS <br />^ HW <br />OPERATOR: Aspen Enterprises ^ HMWMD (CH) <br />STREET: 1~~R~ Wcimhlee Vnlley R~~nl ^ SE <br />CITY/STATE/ZIP: Cnnifar Cn Rn433 ^ WOCD (CH) <br />X Other: Harry Posey, DMG <br />