Laserfiche WebLink
<br /> <br />V. Status of Frob;em 'esoluticn <br />The following items concern orcble.ms ident:_" ed at previous inspections. Problers are classi- <br />fied into tn~o categories. These are: (1) nreblems resolved; and (Z) operator delinquent. <br />The date that the problem 's resolved or the date that the operator is deemed delinquent is <br />to be clearly sCated. <br />Problem Resolved <br />la. Positive drainage was established around the south~.~est side of topsoil stockpile A. <br />Resolution in Progress <br />1. Monitor vegetative growth on road embankments, pond embankments, and topsoil stockpiles. <br />Compliance is ongoing. <br />2. Pond C has been Constructed. Pond certification should be sent to the Division <br />as soon as possible. <br />