Laserfiche WebLink
,s F `: <br />• (Page 3) • <br />MINE ID # OR PROSPECTING ID # M-77-493 <br />INSPECTION DATE 4/29/97 <br />INSPECTOR'S INITIALS ACS <br />stored. As a result, estimation of debris volume by multiplying the yard area by an assumed <br />depth of 5 feet would likely result in an overestimation of the volume of material that <br />exists. However, without additional information, this type of volume estimation will suffice <br />for the purposes of a preliminary cost estimate. The bone yard debris and materials volume <br />can be refined through the provision of additional information from Climax after the snow <br />melts and after Climax reviews the Division's preliminary estimate. <br />5. Several concrete retaining walls were observed at the low end of 6 crusher. <br />No information on concrete retaining walls was provided in the 4/1/94 submittal. Data on the <br />square footage, thickness, and degree of reinforcing of the retaining walls must be provided <br />to the Division to allow estimation of retaining wall demolition costs. <br />Once Climax provides information on conveyor foundations, the preliminary cost estimate for <br />structural demolition can be circulated for review. <br />I & E Contact Address <br />NAME Brvice Romig <br />OPERATOR Climax Molvbdenum CORIDanV <br />STREET Climax Mine <br />CITY/STATE/ZIP Climax. CO 80429 <br />ec: Carl Mount, DMG <br />^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWNID (CH) <br />^ SE <br />^ WQCD (CH) <br />^ OTHER <br />