My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC08660
DRMS
>
Back File Migration
>
Inspection
>
INSPEC08660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:09:31 PM
Creation date
11/18/2007 8:37:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Inspection
Doc Date
10/6/2005
Doc Name
Inspection Report
From
DMG
To
Sunnyside Gold Corp
Inspection Date
8/29/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :DMG <br />Permit or iob action : SR-04 <br />TASK LISTtDIRECT~COSTSI FORM <br />NO. TASK DESCRIPTION USED FLEET TASK <br />SIZE HOURS DIRECT <br />COST <br /> <br />001 -Hau! reclamation equipment to and from Lake Emma/Terry Tunnel area mobilize 4 8.5 $2,404 <br />002 -Walk dozer to Lake Emma @ $66.14/hr x 4 hrs = $264.56 NA 1 4.0 $265 <br />003 -Backfill subsidence feature at Lake Emma dozer 1 19.3 $1,283 <br />004 -Revegetate 6 acres at Lake Emma area revege 1 8.0 $6,899 <br />005 -Revegetate 5 acres at Terry Tunnel revege 1 5.0 $5,749 <br /> <br />006 -Haul reclamation equipment to and from Mayflower Pond 4 area mobilize 4 8.5 $2,428 <br />007 -Finish grade Mayflower Pond 4 sludge cell dozer 1 73.0 $4,866 <br />008 -Revegetate 8 acres at Mayflower Pond 4 revege 1 8.0 $8,441 <br />009 -Revegetate 2 acres at TR-26 borrow area revege i 4.0 $2,239 <br /> <br />010 -Haul reclamation equipment to and from American Tunnel area mobilize 11 8.5 $6,434 <br />011 -Close American Tunnel portal mineseal 1 8.0 $1,713 <br />012 -Demolish and remove mine related structures at American Tunnel area demolish 1 40.0 $32,286 <br />013 -Rip & grade 8 acres at American Tunnel dozer 2 52.3 $15, 740 <br />014 -Rip 8 grade 3 acres at Herbert Placer dozer 1 15.5 $2,333 <br />015 -Back/ill Cement Creek diversion cut excavate 1 4.4 $441 <br />016 -Revegetate f0 acres atAmerican Tunnel area revege 1 8.0 $10,552 <br />017 -Revegetate 3 acres at Herbert Placer area revege 1 4.0 $3,166 <br /> <br /> <br /> <br /> <br /> <br />suaTOrALS: 279.2 $107,239 <br />• includes inFlation factor adjustment of : NA % TOTAL DIRECT COST' <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Llabllty InSUranCe : 2.02 % Of di/eCt total = $2,166 <br />Performance bond : 1.05 % of direct total = $1,126 <br />Job superintendent : 139.61 hrs'...$/hr: $37.50 total = $5,235 <br />Profit : 10.00 % o(direct total = $10,724 <br />'assume nef hours = 50% of Task hours TOTAL O & P = $19, 251 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (tlirect+O&P)= $126,490 <br />Financial warranty processing (legal/related casts) : total = <br />Engineering work and/or contracUbid preparation : 8.00 % o/cntr. NA total = $10,119 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $6,325 <br />CONTINGENCY - 3.00 % Of dileCt total = $3,217 <br />TOTAL INDIRECT COST= $$8,912 <br />TOTAL BOND AMOUNT (direct+indirect) _ $146,151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.