My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC08660
DRMS
>
Back File Migration
>
Inspection
>
INSPEC08660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:09:31 PM
Creation date
11/18/2007 8:37:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Inspection
Doc Date
10/6/2005
Doc Name
Inspection Report
From
DMG
To
Sunnyside Gold Corp
Inspection Date
8/29/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CtRCES Cost Estimatino Software <br />PROJECT IDENTIFICATION <br />Task # : 015 <br />Date : 10/06/2005 <br />User ; WHE <br />State :Colorado Permitfjob # : M-1977-378 <br />County :San Juan Abbreviation :none <br />Site : Sunnyside Mine Filename :M378-015 <br />Agency or organization name : DMG <br />Permit or other job action : SR-04 <br />Task description :Bacldill Cement Creek diversion cut <br />.................. <br />HOURLY EQUIPMENT COST <br />Machine description ;Cat 325C L <br />Cost Breakdown ~ Utilization <br />Ownership cosUhour : $31.60 Nq <br />Operating cosUhour : $36.18 100 <br />Operator cost/hour : $31.97 NA <br />Total unitcosUhour : $99.75 <br />MATERIAL QUANTITIES <br />Initial <br />volume: 1,333 LCY <br />Swell Loose <br />factor : NA volume <br />Source of estimated volume :TR-19 reclamation <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swing loaded dump bucket swing em tp~ <br />Basic job condition description <br />Secondaryjob condition within basic description <br />Cycle time value <br />Bucket Capacity <br />Rated bucket capacity : 2.22 LCY (heaped} Bucket size class <br />Bucket fill factor: 0.85 Hard, Tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.89 LCY <br />Job Condition Correction Factors <br />Site altitude : 11,000 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size ; 1 excavator(s) <br />Unit cost : $0.331 per LCY <br />Horsepower: 140 <br />Weight (MT) : 28.18 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />TotalfleetcosUhour <br />1,333 <br />AVERAGE <br />AVERAGE <br />0.29 <br />$99.75 <br />LCY <br />minutes <br />medium <br /> Source <br />Altitude adjustment : 0.94 (Cat HB) <br />Job efficiency adjustment ; 0.83 (i shift/day) <br />Netjob correction : 0.78 multiplier <br />386.42 LCYlhour <br />301.48 LCY/hour <br />301.48 LCY/hour <br />Total job time <br />Total job cost <br />4.42 hours <br />$441 <br />
The URL can be used to link to this page
Your browser does not support the video tag.