Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (NO. units) CosUhr/fleet CosVhr/fleet <br /> <br /> <br />-Flatbed Truck, 4x2, 30K GVW $43.78 1 $43.78 $43.78 <br /> <br /> <br />-Light Duty Pickup, 4x4, 3/4 T. $34.14 1 $34.14 $34.14 <br /> <br /> <br />-Generic 15-18 cy, 6x4 $77.44 4 ~ $309.74 $309.74 <br />$387.67 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest m ajor city or [own within project area region <br />Transoortation Cvcle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 1.62 1.62 Total non-roadable mob/demob cost' <br />Return time (hours) = 1.62 1.62 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost" <br />Unloading time (hours) = 0.50 NA "one round trip, no haul rig <br />Subtotals = 4.25 ~ 3.25 <br />$387.67 <br />Montrose <br />65.0 miles <br />40.0 mph <br />$5,173.98 <br />$1,259.93 <br />JOB TIME AND COST Total job time : 8.50 hours <br />Total job cost : $6,434 <br />